My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Documents. <br />• Render formal written decisions on issues relating to the <br />acceptability of Contractor's work or the interpretation of the <br />requirements of the Contract Documents pertaining to the <br />execution, performance, or progress of Contractor's Work. <br />® Throughout the construction phase of the project provide <br />engineering assistance services to the Village for the duration <br />of the construction project. A single individual may act in <br />more than one role in certain aspects of the Project (e.g.: <br />Professional Engineer may also act as Construction Manager <br />and Designer on certain portions of the work.). <br />II. FEE; PAYMENTS. For the satisfactory completion of the Services, the Village <br />shall pay Consultant a total fee not to exceed One Hundred Eighty Two <br />Thousand Eight Hundred Four Dollars ($182,804.00) in accordance with the <br />following Schedule: <br />A. Lump sum for Task 1: $18,500.00 <br />B. Lump Sum for Task 2: $4,500.00 <br />C. Lump Sum for Task 2A: $10,500.00 <br />C. Lump sum for Task 3: $51,600.00 <br />D. Lump sum for Task 3A: $25,800.00 <br />E. Lump sum for Task 4: $16,800.00 <br />F. Lump sum for Task 5: $13,440.00 <br />G. Lump sum for Task 6: $6,720.00 <br />H. Lump sum for Task 7: $34,944.00 <br />All Services performed shall be invoiced to the Village. The Village shall <br />pay all proper invoices within thirty (3 0) days from the date of any such <br />252 <br />
The URL can be used to link to this page
Your browser does not support the video tag.