My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractors, conduct and attend pre-bid meeting, respond to <br />questions during bidding, conduct and attend bid opening, prepare <br />bid tabulation and recommend Award of Contract. <br />B. Phase I1. Construction Management; Construction <br />Engineering <br />1. Task 7: Engineering Services During Construction <br />Consultant will perform customary Engineering Services during the <br />Construction Phase of the Project. Such services shall include but <br />may not be limited to the following; <br />• Assist with Execution of Contract Documents -assist Owner <br />and coordinate with the Contractor in execution of the Contract <br />Documents between Owner and the Contractor. <br />- Engineer shall issue a Notice to Proceed (NTP) including, <br />coordinating and attending the Pre -Construction Conference. <br />• Engineer will investigate, study and determine acceptability on <br />any proposed substitutions of material or equipment in <br />accordance with the contract Documents. <br />Prepare and administer Change Orders <br />• Provide technical advice and assistance to Village during the <br />construction period. <br />Provide necessary interpretations and clarifications of the <br />contract Documents. <br />- Receive and respond to RFls related to technical interpretation <br />of the drawings and specifications and requested changes to the <br />work. In accordance with the construction contract documents, <br />• The Professional Engineer will observe the project at a <br />minimum interval of every two weeks. Design Engineers will <br />observe the project at intervals appropriate to the various <br />stages of construction to observe site conditions and the Work <br />to determine whether the work is in general conformance to the <br />251 <br />
The URL can be used to link to this page
Your browser does not support the video tag.