|
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Stephen C. Smith, Project Director / Contract a. TOTAL b. WITH CURRENT FIRM
<br />P. E. Manager 38 37
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Craig A. Smith & Associates, Inc.
<br />Boca Raton, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Science, Civil Engineering,
<br />1988
<br />Auburn University, Auburn, Alabama
<br />Bachelor of Science Building
<br />Construction, 1986
<br />Auburn University, Auburn, Alabama
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer
<br />State of Florida
<br />License No. 48914
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />93
<br />1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (lfApplicable)
<br />Consulting Engineer, Town of Pembroke Park
<br />Pembroke Park, Florida
<br />Ongoing
<br />Ongoing
<br />a
<br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br />Consulting Engineer as it relates to all water, wastewater, road and bridge issues,
<br />NPDES, projects, site plan review and agency coordination (FDOT, SFWMD, etc.).
<br />1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (lfApplicable)
<br />Sanitary Sewer Improvements Phase I
<br />Bal Harbour, Florida
<br />2015
<br />2017
<br />b
<br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br />The Wastewater Pump Station No. 3 and Gravity Sewer Improvements (Sanitary Sewer
<br />Improvements Phase 1) project for Bal Harbour Village includes the installation of a new
<br />triplex submersible pump station with a 12 -foot diameter wet well, control panel,
<br />automatic transfer switch receptacle, emergency generator, and all associated
<br />appurtenances, in addition to approximately 1,350 linear feet of 18" gravity sewer lines
<br />to the pump station. Construction cost: $2,970,000
<br />1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (lfApplicable)
<br />City of Sunny Isles Beach NE 174'h Street
<br />Stormwater and Pavement Improvements
<br />Sunny Isles Beach, Florida
<br />2011
<br />2017
<br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br />The project consists of reconstruction of both drainage and roadway along NE 174th
<br />Street for approximately 0.2 miles from Collins Avenue to North Bay Road. The design
<br />also includes a new drainage system that meets water quality requirements, site
<br />demolition, road regrading, utility relocations, sidewalks, paver walkways, landscaping,
<br />curbing, bike paths and parallel parking. Construction cost: $2,147,800 (Phase 1)
<br />93
<br />
|