Laserfiche WebLink
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Stephen C. Smith, Project Director / Contract a. TOTAL b. WITH CURRENT FIRM <br />P. E. Manager 38 37 <br />15. FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science, Civil Engineering, <br />1988 <br />Auburn University, Auburn, Alabama <br />Bachelor of Science Building <br />Construction, 1986 <br />Auburn University, Auburn, Alabama <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer <br />State of Florida <br />License No. 48914 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />93 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />Consulting Engineer, Town of Pembroke Park <br />Pembroke Park, Florida <br />Ongoing <br />Ongoing <br />a <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Consulting Engineer as it relates to all water, wastewater, road and bridge issues, <br />NPDES, projects, site plan review and agency coordination (FDOT, SFWMD, etc.). <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />Sanitary Sewer Improvements Phase I <br />Bal Harbour, Florida <br />2015 <br />2017 <br />b <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />The Wastewater Pump Station No. 3 and Gravity Sewer Improvements (Sanitary Sewer <br />Improvements Phase 1) project for Bal Harbour Village includes the installation of a new <br />triplex submersible pump station with a 12 -foot diameter wet well, control panel, <br />automatic transfer switch receptacle, emergency generator, and all associated <br />appurtenances, in addition to approximately 1,350 linear feet of 18" gravity sewer lines <br />to the pump station. Construction cost: $2,970,000 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />City of Sunny Isles Beach NE 174'h Street <br />Stormwater and Pavement Improvements <br />Sunny Isles Beach, Florida <br />2011 <br />2017 <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />The project consists of reconstruction of both drainage and roadway along NE 174th <br />Street for approximately 0.2 miles from Collins Avenue to North Bay Road. The design <br />also includes a new drainage system that meets water quality requirements, site <br />demolition, road regrading, utility relocations, sidewalks, paver walkways, landscaping, <br />curbing, bike paths and parallel parking. Construction cost: $2,147,800 (Phase 1) <br />93 <br />