Laserfiche WebLink
94 <br />1)TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (WApplicable) <br />Stormwater & Pump Station Improvements Phase <br />IV <br />2011 2013 <br />d <br />Sweetwater, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Due to repetitive, historical flooding within the 138 acre residential area, Phase IV <br />Stormwater Improvements for the City of Sweetwater received substantial HMGP <br />funding from FEMA. The projects consisted of 130 structures, 10,795 linear feet of <br />drainage pipe ranging in size from 15 -inch to 72 -inch, 1,506 linear feet of 30 -inch force <br />main and 2 -triplex pumping stations (28 HP). Construction cost: $4.09 Million <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (YApplicable) <br />Town of Golden Beach CIP Phase III & IV <br />Stormwater Collection System with Master Pump <br />e <br />Stations <br />2008 2011 <br />Golden Beach, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />The project Consisted of a stormwater master pump station, 14,500 linear feet of DIP <br />drainage pipe and stormwater force main ranging in size from 16 -inch to 72 -inch. <br />Construction cost: $7,667,276 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (WApplicable) "+ <br />Town of Golden Beach Phase IV Stormwater <br />Improvements <br />2004 2006 <br />f <br />Golden Beach, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />The project consisted of the installation of 1,775 linear feet of drainage pipe ranging in <br />size from 15 -inch to 72 -inch, 600 linear feet of force main, 32 drainage structures, a <br />stormwater pump station, a bypass weir structure and a water quality structure. <br />Construction cost: $2,031,740 <br />1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION f1fApplicab/e) <br />Town of Pembroke Southwest 301h Avenue <br />Lighting Improvements <br />2004 2004 <br />s <br />Pembroke Park, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />The project involved installation of new street lights along Southwest 30th Avenue as <br />part of the Town's "Antique Row" beautification project. Construction cost: $175,596 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (lfApplicable) <br />Broward County McNab Road Improvements <br />Broward County, Florida <br />2002 2006 <br />h : <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />The project consisted of approximately 1 mile of widening the existing four -lane <br />divided road to a six -lane divided road with additional turn lanes. In addition, the <br />project included approximately 4,700 Lf of pipe culverts, approximately 5,600 linear feet <br />of exfiltration trench with manholes and inlets, sidewalks, traffic signalization, striping <br />and signage, landscaping and street lighting. Construction cost: $4,571,400 <br />94 <br />