94
<br />1)TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (WApplicable)
<br />Stormwater & Pump Station Improvements Phase
<br />IV
<br />2011 2013
<br />d
<br />Sweetwater, Florida
<br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br />Due to repetitive, historical flooding within the 138 acre residential area, Phase IV
<br />Stormwater Improvements for the City of Sweetwater received substantial HMGP
<br />funding from FEMA. The projects consisted of 130 structures, 10,795 linear feet of
<br />drainage pipe ranging in size from 15 -inch to 72 -inch, 1,506 linear feet of 30 -inch force
<br />main and 2 -triplex pumping stations (28 HP). Construction cost: $4.09 Million
<br />1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (YApplicable)
<br />Town of Golden Beach CIP Phase III & IV
<br />Stormwater Collection System with Master Pump
<br />e
<br />Stations
<br />2008 2011
<br />Golden Beach, Florida
<br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br />The project Consisted of a stormwater master pump station, 14,500 linear feet of DIP
<br />drainage pipe and stormwater force main ranging in size from 16 -inch to 72 -inch.
<br />Construction cost: $7,667,276
<br />1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (WApplicable) "+
<br />Town of Golden Beach Phase IV Stormwater
<br />Improvements
<br />2004 2006
<br />f
<br />Golden Beach, Florida
<br />3) BRIEF DESCRIPTION (Briefscope, size, cost etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br />The project consisted of the installation of 1,775 linear feet of drainage pipe ranging in
<br />size from 15 -inch to 72 -inch, 600 linear feet of force main, 32 drainage structures, a
<br />stormwater pump station, a bypass weir structure and a water quality structure.
<br />Construction cost: $2,031,740
<br />1) TITLE AND LOCATION (Cityand State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION f1fApplicab/e)
<br />Town of Pembroke Southwest 301h Avenue
<br />Lighting Improvements
<br />2004 2004
<br />s
<br />Pembroke Park, Florida
<br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br />The project involved installation of new street lights along Southwest 30th Avenue as
<br />part of the Town's "Antique Row" beautification project. Construction cost: $175,596
<br />1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (lfApplicable)
<br />Broward County McNab Road Improvements
<br />Broward County, Florida
<br />2002 2006
<br />h :
<br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm
<br />The project consisted of approximately 1 mile of widening the existing four -lane
<br />divided road to a six -lane divided road with additional turn lanes. In addition, the
<br />project included approximately 4,700 Lf of pipe culverts, approximately 5,600 linear feet
<br />of exfiltration trench with manholes and inlets, sidewalks, traffic signalization, striping
<br />and signage, landscaping and street lighting. Construction cost: $4,571,400