My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:25:21 AM
Creation date
9/6/2018 11:16:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1) TITLE AND LOCATION (City and State) <br />City of Sweetwater Stormwater & Pump Station PROFESSIONAL SERVICES I CONSTRUCTION rtt:. <br />Improvements (Phase I & III) 2000 2004 <br />Sweetwater, Florida <br />BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE <br />X Check if project performed with current firm <br />The project consisted of 115 structures, 7,400 linear feet of drainage pipe ranging in <br />size from 15 -inch to 72 -inch, 7,325 linear feet of stormwater force main ranging in size <br />from 24 -inch to 48 -inch, four duplex pump stations, roadway restoration and complete <br />reconstruction of 2,500 linear feet of NW 112th Avenue. Construction cost: $7,058,530 <br />OR <br />
The URL can be used to link to this page
Your browser does not support the video tag.