|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for Each key person.)
<br />19. RELEVANT PROJECTS
<br />12. NAME
<br />16. EDUCATION (Degree and Specialization)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />13. ROLE IN THIS CONTRACT
<br />a. TOTAL b. WITH CURRENT FIRM
<br />14. YEARS OF EXPERIENCE
<br />BACHELOR LANDSCAPE ARCHITECTURE, BALL STATE-INB.S., ENVIRONMENTAL DESIGN, BALL STATE UNIVERSITY-IN
<br />Professional Associations: American Society of Landscape Architects Chairperson 1990 Broward Section; Florida Urban Forestry Council President 1999; Landscape Inspectors Society of Florida; International Society of Arboriculture
<br />CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL
<br />2010 2011
<br />(1) TITLE AND LOCATION (City and State)
<br />a.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDRoundabout at Taft Street and 40th AvenueHollywood, Florida
<br />Lead Designer – Prepared hardscape, landscape and irrigation design plans for a road closure and roundabout circle at the intersection of Taft Street and 40th Avenue in Hollywood. This project was in response for a need for traffic calming near the new Joe DiMaggio Children’s Hospital.
<br />Check if project performed with current firmX
<br />2016 2018
<br />(1) TITLE AND LOCATION (City and State)
<br />b.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDDavie Road Improvements – Phase OneDavie, Florida
<br />Lead Designer - Prepared landscape and irrigation design for the new medians as part of a road widening and complete streets project for Davie Road from Nova Drive to I-595. This included coordinating the relocation of several large Royal Palms from the roadway to a few nearby parks in the Town of Davie.
<br />Check if project performed with current firmX
<br />2014 2017
<br />(1) TITLE AND LOCATION (City and State)
<br />c.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDPines Boulevard – Beautification Grants – Phase One & TwoPembroke Pines, Florida
<br />Project Manager, Lead Designer – Prepared detailed construction drawings and specifications for the landscape and irrigation improvements on two segments of Pines Boulevard east of the Florida Turnpike in Pembroke Pines. This included implementing two Florida Highway Beautification Council grants and obtaining all approvals of the plans from FDOT. In addition, a Design Variance was obtained for the preservation of several existing large Royal Palms located in the medians.
<br />Check if project performed with current firm
<br />2010 2011
<br />(1) TITLE AND LOCATION (City and State)
<br />d.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDBonaventure Boulevard and Blatt Road RoundaboutWeston, Florida
<br />Lead Designer - Provided landscape design and coordinated with traffic, electrical and civil engineering for a new roundabout. The project included the integration of landscape planting signage, branding, wayfinding, lighting, bicycle trails and pedestrian pathways.
<br />Check if project performed with current firmX
<br />2011 2012
<br />(1) TITLE AND LOCATION (City and State)
<br />e.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDN.W. 27th Avenue Streetscape Miami-Dade County, Florida
<br />Project Manager, Lead Designer - Developed a planting and irrigation design for the FDOT roadway through two cities and several districts. Mr. Conner was responsible for all permitting and coordination of several consumptive-use permits for varying zones through various segmented agencies and three municipalities, the implementation of City wayfinding and detailing specialty planting design to provide each city with their own character.
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />MICHAEL CONNER, ASLA, RLA LEAD LANDSCAPE ARCHITECTURE 30+14+
<br />REGISTERED LANDSCAPE ARCHITECTFL NO. LA0001181ISA CERTIFIED ARBORIST, FL NO. FL0777
<br />2011 2012
<br />(1) TITLE AND LOCATION (City and State)
<br />f.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDMemorial Regional Hospital - 35th Avenue StreetscapeHollywood, Florida
<br />Lead Designer - Responsible for the construction detailing of hardscape components and planting for a streetscape design and wayfinding for a re-dedicated roadway segment to the hospital campus as part of this LEED-Gold project.
<br />Check if project performed with current firmX
<br />106
|