Laserfiche WebLink
2012 2014 <br />(1) TITLE AND LOCATION (City and State) <br />g. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDSE 17th Street Causeway (S.R. A1A) - Beautification GrantFort Lauderdale, Florida <br />Project Manager, Lead Designer – Prepared detailed construction drawings for the landscape and irrigation improvements for the medians on S.E. 17th Street (S. R. A1A) just east and west of the bridge over the Intracoastal Waterway in Fort Lauderdale. This included implementing a Broward County Highway Beautification grant and obtaining all approvals of the plans from FDOT. The design featured several large Medjool Date Palms as part of the state of Florida’s new Bold Initiative program. <br />Check if project performed with current firmX <br />2015 2017 <br />(1) TITLE AND LOCATION (City and State) <br />h. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDSR A1A – Beautification GrantFort Lauderdale, Florida <br />Project Manager, Lead Designer - Prepared construction drawings and bid specification for the landscape and irrigation improvements in the medians on S. R. A1A south of East Oakland Park Boulevard. This included implementing a Florida Highway Beautification Council grant and obtaining all approvals of the plans from FDOT. The design intent was to transform this section of S.R. A1A to a more updated look by removing some old existing Black Olive trees and planting mature Coconut Palms. <br />Check if project performed with current firmX <br />2013-2014 2014 <br />(1) TITLE AND LOCATION (City and State) <br />i. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDDania Cove ParkDania Beach, Florida <br />Project Manager, Lead Designer – Developed a custom design for 13 bus shelters along Weston Road with the city’s branded character, coordinated with Broward County Traffic Engineering and Transit agencies, constructed site design and ADA improvements, and prepared grant applications for funding of the project. <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />2017 Ongoing <br />(1) TITLE AND LOCATION (City and State) <br />j. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDAndrews Avenue Improvements – Transportation Enhancement Grant; Oakland Park, Florida <br />Lead Designer - Developed a new planting and irrigation design for the major improvements to the Broward County roadway through the City of Oakland Park as part of a Broward MPO Grant. Mr. Conner was responsible for all permitting and coordination of approvals through various agencies, as well as the City of Oakland Park’s review process. The design for the roadway includes new medians, reduced lane sizes, and new bike lanes in addition to the landscape enhancements. <br />Check if project performed with current firmX <br />2009 2010 <br />(1) TITLE AND LOCATION (City and State) <br />k. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDManatee Isles Drive – Bike lanesWeston, Florida <br />Project Manager, Lead Designer - Prepared site design for roadway improvements and the provision of bike lanes in response to increased demand generated by the Manatee Isles Elementary School, including tree relocation coordination, landscape planting and irrigation plans. <br />Check if project performed with current firmX <br />2011 2012 <br />(1) TITLE AND LOCATION (City and State) <br />l.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDNW 183rd Street – Phase II BeautificationMiami Gardens, Florida <br />Project Manager, Lead Designer - Prepared hardscape, landscape and irrigation design plans for a 1.78 mile long section of the FDOT roadway to enhance the existing landscape along the corridor and add a new irrigation system. <br />Check if project performed with current firmX <br />2007 2009 <br />(1) TITLE AND LOCATION (City and State) <br />m.(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDThree Village Road – Bike lanesWeston, Florida <br />Project Manager, Lead Designer - Provided site design for roadway improvements and the provision of bike lanes in response to increased demand generated by Country Isles Elementary School, including public meetings, tree relocation coordination, stone retaining walls, landscape planting and irrigation plans. <br />Check if project performed with current firmX <br />107