|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for Each key person.)
<br />19. RELEVANT PROJECTS
<br />12. NAME
<br />16. EDUCATION (Degree and Specialization)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />13. ROLE IN THIS CONTRACT
<br />a. TOTAL b. WITH CURRENT FIRM
<br />14. YEARS OF EXPERIENCE
<br />MIAMI DADE COMMUNITY COLLEGE, MIAMI, FLORIDA A.A. IN ARCHITECTURE
<br />Mr. Mendoza directs the landscape architectural staff in all code compliance and site design issues, ensuring that Quality Control and construction documents are consistent and thorough, while meeting location-specific permit criteria. He will contribute his expertise in leading and directing the production and development of construction permit plans and in site detailing for constructability.
<br />CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL
<br />2014 Ongoing
<br />(1) TITLE AND LOCATION (City and State)
<br />a.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDMills Pond Park: Soccer/Lacrosse FieldsFort Lauderdale, Florida
<br />Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil engineering, electrical engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design of the new fields will include drainage, lighting, and irrigation as well as associated parking, walkways, and landscape improvements. Construction cost is estimated at $3.3 million, with completion scheduled for December, 2016. CGA’s fees: $379,000.
<br />Check if project performed with current firmX
<br />2016
<br />(1) TITLE AND LOCATION (City and State)
<br />b.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDSoccer Field Conversion at Weston Regional Park Weston, Florida
<br />The city of Weston will be converting two soccer fields to synthetic turf, these conversions will be the first of two park field conversions in the city. The selected synthetic turf option uses an organic infill material rather than the standard black rubber material. These fields will be cooled down with the use of long range rotors specifically designed for synthetic turf cooling & cleaning. Services included Civil Engineering as well. CGA’s fees: $350,000.00.
<br />Check if project performed with current firmX
<br />2015
<br />(1) TITLE AND LOCATION (City and State)
<br />c.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDFootball Field Conversion at Cypress Bay High School Weston, Florida
<br />Prepared detailed site plans and irrigation plans for the conversion of an existing turf football field park to synthetic turf. The selected turf option is to use an organic fill material rather than the standard black rubber material. This required a cooling system and for cost saving a specialized booster pump with 4 custom ports where created in order to use a self-reeling watering wheel system. Services included Civil Engineering as well. CGA Fees: $100,000.
<br />Check if project performed with current firmX
<br />2002 2006
<br />(1) TITLE AND LOCATION (City and State)
<br />d.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDVista ParkWeston, Florida
<br />CGA developed the master plan for Vista Park which is adjacent to Cypress Bay High School. With four soccer fields and four baseball fields, this park is well utilized by Weston residents as well as the high school. Special detailing of the edges of the fields were designed to address the clay and sod areas by creating header curbs to separate those areas. The design, construction documents and construction administration was provided by CGA. Cost: $5.5 million
<br />Check if project performed with current firmX
<br />2012 Ongoing
<br />(1) TITLE AND LOCATION (City and State)
<br />e.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDMiddle Beach Recreational CorridorMiami Beach, Florida
<br />Responsible for all irrigation design for a 2-mile long multi-use trail linear park to be constructed on State lands. The irrigation design is consistent with the City's standards for product selection, specification and maintenance. The system was designed for water conservation strategies and minimal impacts to the environment. CGA’s fees: $534,000.
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />MARCOS MENDOZA LANDSCAPE ARCHITECT IRRIGATION/SITE DESIGN 24 20
<br />108
|