Laserfiche WebLink
2013-2018 2018-Present <br />(1) TITLE AND LOCATION (City and State) <br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDNatalie’s Cove Drainage ImprovementsCooper City, Florida <br />Project Engineer for the design and modification of a stormwater conveyance system for drainage improvements in the local neighborhood. A drainage model and analysis was conducted for the entire basin, and it was determined that significant improvements could be attained by increasing conveyance pipe sizes throughout the system. Also, stormwater level of service would be improved by increasing the existing lake storage capacity and by dredging along the bank to create wetlands on a littoral shelf. In addition to these stormwater improvements, the project consisted of roadway resurfacing and ADA compliance for pedestrian sidewalks. Project responsibilities included hydraulic modeling, design, permitting, addressing agency comments, preparing quantity take-offs, cost estimating, preparing technical specifications, and providing professional services during bidding. CGA is currently under contract to provide services during construction that include reviewing shop drawings, addressing RFI’s, construction inspections, and final certification. <br />Check if project performed with current firmX <br />2015-2016 2016 <br />(1) TITLE AND LOCATION (City and State) <br />e. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDLift Station No. 52 ReplacementCooper City, Florida <br />Project Manager for a municipal sewer pump station replacement project. Improvements were needed due to the expiring service life of the pumps and their insufficient operating capacity during peak flows. Tasks included design, permitting, interpreting pressure data logger readings, hydraulic calculations, coordinating with pump manufacturers, existing sewer flow analysis, monitoring geotechnical work, and coordinating with other professional disciplines. <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />2014-2015 2015-2017 <br />(1) TITLE AND LOCATION (City and State) <br />f. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDBid Pack 9 Infrastructure ImprovementsOakland Park, Florida <br />Project Engineer during the construction phase of a large scale infrastructure improvements project that included replacement of three municipal lift stations, approximately 20,000 linear feet of water main, 5,600 linear feet of force main, and significant drainage improvements throughout the 500 acre site. Responsibilities included shop drawing reviews, attending progress meetings, engineering during construction, as-built reviews, reviewing change orders, and coordinating final certifications. <br />Check if project performed with current firmX <br />2015-2018 N/A <br />(1) TITLE AND LOCATION (City and State) <br />g. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDBid Pack 8 Infrastructure ImprovementsOakland Park, FL <br />Project Engineer for the water and sewer improvements project. Design included approximately 18,000 linear feet of water main replacement, 800 linear feet of new drainage with exfiltration trench, 2,500 linear feet of new sidewalk, rehabilitation of a sewer pump station, and installation of four sewer combination air valves (SCAV). The system upgrades consisted of replacing two and four-inch diameter water main with either six or eight-inch pipes. Additional fire hydrants were designed to adequately provide fire protection for the residential neighborhoods. In addition to these water main improvements and SCAV’s for the force main sewer transmission, the sewer pump station improvements were a critical component of this project. The station was experiencing failure due to extended run times because of an increase in the collected wastewater flows and discharge force main pressures. Electrical upgrades and the design of variable frequency drives were required to handle the various flow conditions. Project responsibilities included water main and hydrant design, preparing quantity take-offs, cost estimating, preparing technical specifications, permitting, and addressing Bidder RFI’s. <br />Check if project performed with current firmX <br />2017-2018 2018 <br />(1) TITLE AND LOCATION (City and State) <br />h. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDLift Station No. 9 RehabilitationDavie, FL <br />Project Manager for a municipal sewer pump station rehabilitation project. The existing pumps failed when the mechanical room flooded with sewage backflow from the adjacent wet well. Since the station was being operated 24 hours/day by a portable diesel-powered bypass pump in a residential neighborhood, it quickly became a priority project for the Town. The project was unique in that the station is located within the City of Hollywood. Therefore, additional coordination was required between the two municipalities for permitting and construction scheduling. The project scope included site visit documentation, pump manufacturer coordination and specifications, sewer flow analysis, hydraulic calculations, ventilation system sizing, electrical and instrumentation, sump pump and piping replacement, cost estimating, permitting, preparation of contract documents for bidding, addressing Bidder questions, reviewing bids for award of contract, shop drawings reviews, addressing Contractor RFI’s, reviewing and negotiating change orders, construction inspections, and final project certification. <br />Check if project performed with current firmX <br />110