Laserfiche WebLink
2015-2017 2018 <br />(1) TITLE AND LOCATION (City and State) <br />i. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDBayshore Drive Drainage and ImprovementsFort Lauderdale, FL <br />Project Manager for the analysis and design of drainage system improvements in the Central Beach Alliance Neighborhood off of A1A. The scope included preparation of a drainage model of the existing site conditions by using ICPR and utilizing survey, record drawings, and LIDAR for calibration. A full drainage report summarized the different options for improvements in the area with associated costs. Some of the proposed alternatives included exfiltration trenches, drainage injection wells, and tidal check valves. Ultimately, the City asked us to design tidal check valves on the outfall pipes and additional stormwater structures and conveyance piping in areas with significant ponding. Additionally, the City requested traffic improvements and the addition of a median at the unique intersection of Bayshore Drive, Riomar Street, and Antioch Avenue. CGA conducted a traffic safety study to justify the proposed median and sidewalk layout. The intersection design included some re-grading for drainage, pavement markings, signage, and permitting through Broward County. CGA also provided typical services during construction including shop drawing review, addressing RFI’s, and coordinating final certifications. <br />Check if project performed with current firmX <br />2015-2017 2017-2018 <br />(1) TITLE AND LOCATION (City and State) <br />j. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDSewer Pump Station D-41 ReplacementFort Lauderdale, FL <br />Project Manager for a municipal sewer main and pump station replacement project. Upgrades to the station’s operating capacity were needed due to excessive flows, frequent surcharging, and accommodation for future development sewer contributions. The scope entailed replacement and relocation of the existing station and redirection of the sewer conveyance network. Tasks included analysis of existing sewer flow contributions, review of existing force main pressures, hydraulic calculations for designing new force main and submersible pumps, valve vault design, electrical and instrumentation, permitting, coordinating with other disciplines including Geotechnical, preparing technical specifications, bidding assistance, addressing Contractor RFI's, reviewing and negotiating change orders, shop drawing reviews, routine inspections, as-built reviews, and final certifications. Coordination played a major role in this project as the proposed location for the pump station and design of the new sewer main had to be planned with the neighboring development and their design team. <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />2015-2017 2017-2018 <br />(1) TITLE AND LOCATION (City and State) <br />k. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDSewer Pump Station B-10 RehabilitationFort Lauderdale, FL <br />Project Manager for a municipal sewer pump station rehabilitation project. Existing pumps were reaching the end of their service life, and the existing concrete wet well was consistently leaking into the dry station. Tasks included analyzing existing flow and pressure conditions, hydraulic calculations, specifying new pumps, new electrical and ventilation design, permitting, development of bidding documents, bidding assistance, addressing Contractor RFI's, reviewing shop drawings, conducting routine inspections, reviewing and negotiating change orders, as-built review, and final certification. <br />Check if project performed with current firmX <br />2017-2018 2018-Present <br />(1) TITLE AND LOCATION (City and State) <br />m. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDCroissant Park Small Water Main ImprovementsFort Lauderdale, FL <br />Project Manager for a residential project to replace 16,000 linear feet of undersized and deteriorating water main with new PVC and DIP piping. Additionally, the existing piping did not provide proper fire protection to the neighborhood. Local residents were also filing complaints regarding water discoloration which was caused by corrosion of the existing cast iron mains. The project scope included design, permitting, reviewing and incorporating Geotechnical report findings, coordinating subsurface utility exploration for conflict resolutions, preparing quantity take-offs, cost estimating, preparing technical specifications, and addressing Bidder RFI’s. CGA is currently under contract to provide services during construction that include reviewing shop drawings, addressing Contractor RFI’s, conducting interim inspections, and final certification. <br />Check if project performed with current firmX <br />2016-2017 2017-2018 <br />(1) TITLE AND LOCATION (City and State) <br />l. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDLift Station No. 21 ReplacementCooper City, FL <br />Project Manager for a municipal sewer pump station replacement project. The station is located within an HOA and required mechanical, aesthetic, and immediate odor control improvements. Due to its close proximity with adjacent residences and frequent complaints, the station was relocated across the street. This required a sewer conveyance, landscape, and irrigation redesign. Tasks included design, permitting, interpreting pressure data logger readings, hydraulic calculations, coordinating with pump manufacturers, existing sewer flow analysis, preparing specifications, permitting, shop drawing reviews, addressing Contractor RFI’s, routine construction inspections, and final certification. <br />Check if project performed with current firmX <br />111