Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for Each key person.) <br />19. RELEVANT PROJECTS <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />B.S., CIVIL ENGINEERING, UNIVERSITY OF DAYTON, 2005 <br />Mr. Messick’s experience includes both the private and public sectors of civil engineering. Responsibilities include general site development for public engineering projects, design of septic/lift stations, large scale stormwater management systems, sewage collection and transmission systems, and water distribution systems, along with the permitting of stormwater management systems, utilities and local roadway improvements to Florida Department of Transportation, Florida Department of Environmental Protection, and Florida Department of Health, along with applicable south Florida counties, municipalities and local agencies, and detailed experience with engineering services during construction.. <br />CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL <br />2014-2015 2016-2018 <br />(1) TITLE AND LOCATION (City and State) <br />a. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDCity Center Parking LotPembroke Pines, Florida <br />Lead designer for parking lot to serve future City Center development in the City of Pembroke Pines, Florida. Parking lot modifications included driveway connectivity and roadway relocation to provide ease of access and reduce impacts from existing FPL transmission lines and associated power poles throughout previously permitted design. Project includes modifying drive aisles locations, parking lot reconfiguration, ADA accessibility, pavement marking and signage, and drainage modifications to previously permitting project. Project was construction with construction costs of 7.5 million and design fees of $354,000. <br />Check if project performed with current firmX <br />09/2009-10/2015 Future <br />(1) TITLE AND LOCATION (City and State) <br />b. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDBasin 5 Stormwater Master Plan, Phase IIDania Beach, Florida <br />Project manager for initial design and permitting for the improvements contained in the recommendation of the Storm Water Master Plan of Basin 5, Phase II in the Dania Beach, Florida. Project consists of three duplex pump stations, more than 20,000 linear feet of high capacity storm sewer improvements to improve storm water conveyance, increase of discharge outfall structure efficiency and exfiltration trenches to improve area water quality. Mr. Messick leads to redesign of this project to provide a bio-swale located on county maintained tidal intercostal West Lake Park, and will reduce storm stages with the construction of the three duplex pumps. Phase II includes verifying existing utilities are not in conflict and providing upgrades to several intersections to meet ADA criteria. Total construction costs anticipated for this project are $12.2 million and engineering design fees of $405,000. <br />Check if project performed with current firmX <br />12/2014-04/2015 06/2015-12/2015 <br />(1) TITLE AND LOCATION (City and State) <br />c. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDSW 17th St & SW 83rd Ave Roadway ImprovementsNorth Lauderdale, Florida <br />As project manager, Mr. Messick was in charge of complete streets roadway design for this project located in the City of North Lauderdale, Florida. Project consists of lane widening and curb/gutter drainage for an existing undersized collector road, which provides access to two elementary schools and surrounding residential neighborhoods. Project improvements included de-mucking a portion of existing roadway, mill/resurfacing, roadway widening and ADA compliance sidewalk and driveway crossings for the heavy pedestrian traffic from the existing school. Design also includes converting an existing non-stop roadway intersection into a stop warranted raised intersection with school crossing. Permitting has been completed through North Lauderdale Water Control District, Broward County Traffic and City of North Lauderdale, and construction completed in early 2016. Project was awarded and construction for approximately $1.2 million with design fees of $78,000. <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />JAMES MESSICK, PE WATER/SEWER ENGINEER 14 4 <br />PE STATE OF FLORIDA NO. 70870 <br />2014-2015 2015-2016 <br />(1) TITLE AND LOCATION (City and State) <br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETEDLloyd EstatesOakland Park, Florida <br />Assisted with the lift station outparcel for an improved stormwater management system to aid in the reduction of flood duration and elevation during storm events within the Lloyd Estates neighborhood. The improvements included a bioswale and typical driveway design. Grant services were provided for this project that resulted in approximately $4 Million of funding from the FEMA Hazard Mitigation Grant Program. Project was awarded for approximately $7.8 Million and is currently under construction and with professional civil engineering design fees of $888,000. <br />Check if project performed with current firmX <br />112