My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-08-01) Consulting Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2018 11:36:42 AM
Creation date
9/6/2018 11:29:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. EXAMPLE PROJECT <br /> KEY NUMBER <br />2011-2013 2013 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.)05 <br />23. PROJECT OWNER’S INFORMATION <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />21. TITLE AND LOCATION (City and State) <br />a. PROJECT OWNER <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETEDNEWPORT FISHING PIERSUNNY ISLES BEACH, FLORIDA <br />City of Sunny Isles Beach <br />The City had already completed several CIP projects with CGA, so when it came time to select the turn-key Project Managers for the Newport Fishing Pier demolition, design, permitting and reconstruction, CGA was again selected. The design and permitting of the pier required coordination with FDEP, DRER, USACE, USCG, MD Fire Department and the City’s building department. The scope of work also included site inspections, vibration & settlement monitoring, and the administration of all budgets, claims, change orders, RFI and contract addenda. <br />After successfully permitting the pier, CGA managed the demolition of the existing pier and the construction of the 776-foot long pier, which included a 6,200 sf restaurant and second story lifeguard office and observation tower. The pier decking was placed atop 24”x24” precast-driven piles. The project also required the design, permitting and installation of new utility lines from Collins Ave. <br />CGA is proud to announce the Newport Fishing Pier opened on time and $127,000 under budget with a grand opening party being held on the pier on June 16, 2013. <br />Aerial footage of Newport Fishing Pier: <br />http://www.calvin-giordano.com/cga-videos/ <br />Construction Cost: $4,000,000.00Firm Fee's: $467,000.00 <br />Bill EvansAssistant City Manager 305.947.0606 <br />Calvin, Giordano & Associates, Inc.a.Fort Lauderdale, FL Prime <br />b. <br />c. <br />d. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />125
The URL can be used to link to this page
Your browser does not support the video tag.