Laserfiche WebLink
20. EXAMPLE PROJECT <br /> KEY NUMBER <br />2011-2018 2018 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.)06 <br />23. PROJECT OWNER’S INFORMATION <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />21. TITLE AND LOCATION (City and State) <br />a. PROJECT OWNER <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETEDSUNNY ISLES BEACH NORTH BAY ROAD BRIDGE; SUNNY ISLES BEACH, FLORIDA <br />City of Sunny Isles Beach <br />CGA was retained by the City of Sunny Isles Beach to survey, design, permit, and administer the construction of the North Bay Road Bridge, spanning a canal between 174th St. and 172nd St. along North Bay Road. The principal function of the bridge is to provide pedestrian access across the canal. The proposed 263’ span will also provide access across the canal to emergency vehicles as a bypass to Collins Ave. during periods of heavy traffic congestion. <br />The project included several work efforts adjacent to the bridge, including the construction of an observation deck in Town Center Park, located at the eastern end of the canal, and a boardwalk connecting the deck to the North Bay Road bridge. Associated drainage, roadway, utility, and hardscape improvements were made along 174th St. and 172nd St. to account for the increased drainage and other impacts to the surrounding infrastructure. <br />The project involved intensive coordination with regulatory agencies, utilities, government entities, and local stakeholders. The CGA team was able to procure all necessary permits to conduct the work on schedule. <br />CGA provided construction engineering and inspection services throughout the duration of construction, which was completed in early 2018. <br />Construction Cost: $7.8 MFirm Fee's: $1.2 M <br />Elka Linton-DorsettCIP Program Manager 305.792.1939 <br />Calvin, Giordano & Associates, Inc.a.Fort Lauderdale, FL Prime <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />126