Laserfiche WebLink
16CES Consultants ● City of Sunny Isles Beach RFQ No. 18-11-01 <br />Moffat and Nichols have completed feasibility and planning studies, <br />cost estimates, preliminary and final designs plus construction <br />support for several thousand ports and waterfront projects around <br />the globe. Tim Blankenship, PE and Christy Brush specializes in <br />environmental permitting of coastal, waterfront and infrastructure <br />projects through the myriad of agencies with jurisdiction in Miami- <br />Dade County. Tim has over 20 years of experience designing and <br />permitting complex projects through stringent constraints of the <br />Biscayne Bay Aquatic Preserve. These projects include stormwater <br />outfall retrofit including large pump station and outfall design, <br />stormwater management, public parks, streetscape, and shoreline <br />stabilization. <br />CTS Engineering Designing and implementing a new facility such as <br />the future Golden Shores Pump Station, will likely require a review <br />of traffic accessibility for equipment maintenance and operators <br />for the new facility and equipment. The pump station appears to <br />be currently located under the FDOT Right of Way, clearances and <br />turning radii will need to be evaluated for entrance and accessibility <br />to the new facility. CTS brings a wealth of experience in Traffic Control <br />and Traffic Management <br />ongitude Surveyors Eduardo (Eddie) Suarez, PSM, has been in the <br />Land Surveying profession in South Florida for the past 30 years <br />and has direct experience working for Sunny Isles Beach. Eddie has <br />extensive experience in the preparation of a wide variety of projects <br />and surveys with a diverse array of clients for both, the public and <br />private sector. He has served as Principal-in-Charge for hundreds of <br />Boundary and Topographic Surveys. <br />Langan Engineering Is a geotechnical firm with a local office in Miami <br />Lakes and has been conducting projects across Florida since 1974, <br />including the PortMiami Tunnel Langan has worked with Ric-Man <br />Construction in the Brickell Sewer Interceptor Project. On that project, <br />Lead Geotechnical Engineer Rafael Pina, PE, conducted subsurface <br />investigations and geotechnical engineering evaluations required <br />for the design of the vertical shafts, man-hole structures and sewer <br />pipelines. Rafael also provided the geotechnical parameters required <br />for developing the methods for micro-tunneling and excavation. <br />Tobon Engineering has extensive experience in Utility Resiliency as <br />well as rehabilitation and reconstruction of surficial, Floridan Aquifer <br />and deep wells. Tobon Engineering brings a wealth of experience <br />in the construction, testing, permitting and coordinated of injection <br />wells. As the former Director of Engineering for Palm Beach County <br />Utilities, Mr. Tobon resolved significant challenges as it relates to <br />design construction, and operations. Palm Beach County Lake Region <br />Water Treatment Plant needed additional wells constructed by a <br />new approach following significant and rapid increases in salinity <br />in existing upper Floridan aquifer wells. Due to limited funding for <br />new wells, this project needed testing without incurring the added <br />expense of specialized deep well testing by the well contractor. <br />The well design approach included collecting critical data during <br />construction of the well without slowing down the drilling contractor. <br />This greatly reduced well construction costs. This approach allowed <br />water quality and flow characteristics of the aquifer to be identified <br />and quantified prior to installing the final casing. The result was a well <br />completed in the most optimal interval for long term water quality <br />sustainability while maximizing performance. <br />Infinity Communication is a full service SBE/CBE/DBE Certified <br />Company, specializing in Public Outreach, Public Relations, and <br />Creative Services for the public and private sectors. ISC successfully <br />executes public outreach efforts throughout South Florida for the <br />Florida Department of Transportation, as well as other municipalities <br />in Miami-Dade and Broward counties. ISC has conducted public <br />outreach for more than 200 transportation projects in Planning, <br />PD&E, Design and Construction. <br />Project Manager and Key Team Members <br />The CES Team will be led by Our Project Principal Fernando A. <br />Vazquez, PE. Throughout his 30-year career, Fernando oversaw <br />over $3 Billion in engineering and construction projects worldwide. <br />As the City Engineer and Director of Capital Improvements for the <br />City of Miami Beach, Fernando was directly responsible for the <br />planning, funding, engineer, implementation and certification of over <br />$1.0 Billion of infrastructure improvements with a great majority of <br />projects focused in Stormwater and Flood Control. Fernando led the <br />design and construction and regulatory implementation of numerous <br />large stormwater pump stations that served neighborhoods such <br />Bayshore, Sunset Islands, Star Island, Biscayne Point, Normandy Isles, <br />Flamingo and South Beach. As City Engineer, Mr. Vazquez revamped <br />the City’s Technical Standards which also included innovative <br />treatment and disposal methodologies to maximize water quality <br />while minimizing impacts to the systems conveyance capacity. Mr. <br />Vazquez also spearheaded the first Citywide Stormwater Master Plan <br />in Miami Beach to take into consideration impacts associated to Sea <br />Level Rise. The same master plan was utilized by the Miami Dade <br />County Sea Level Rise Committee for follow up recommendations <br />to the South Florida Regional Compact which alongside established <br />future benchmarks for SLR. Mr. Vazquez serves also as the <br />Engineering Project Principal for the full reconstruction of West <br />Avenue in Miami Beach. West Ave is one of the lowest points in <br />the City of Miami Beach and it is also an area that is subject to new <br />development and increased economic development. CES is currently <br />designing a 90,000 gpm stormwater Pump Station as part of this <br />mega-project. <br />Our Project Manager Jose Caraballo, PE is highly experienced water <br />and wastewater engineer, licensed in the State of Florida, who has <br />managed the design of multiple large municipal pump stations <br />including several wastewater booster stations. Jose will serve as <br />Engineer-of-Record for Golden Shores Pump Station, He brings over <br />15 years of design and construction experience in water infrastructure. <br />Mr. Caraballo is intimately knowledgeable of national, regional and <br />local design standards for pump stations. Jose has also proven <br />experience in other aspects of the civil, structural and mechanical <br />design for our WASD pump stations. Mr. Caraballo’s knowledge of <br />pump station design, his familiarity with standards, his experience <br />with regulatory agencies, and construction experience makes him an <br />effective design leader. Mr. Caraballo has also developed a system <br />analysis that allows for effective, efficient, and accurate analysis and <br />assessment of pump station in order to streamline the analysis and <br />design of a Pump Station System. This system has been vetted with