My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:26:28 PM
Creation date
12/11/2018 2:41:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. EXAMPLE PROJECT <br /> KEY NUMBER <br />12/2007-01/2009 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.)01 <br />23. PROJECT OWNER’S INFORMATION <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />21. TITLE AND LOCATION (City and State) <br />a. PROJECT OWNER <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETEDOkeechobee Landfill - Okeechobee, FL <br />LS Simms & Associates <br />Drill, construct and test one injection well and monitor well using various casing strings with surface facilities. Conduct straddle packers and pressure testing. Installed and grouted all casings. Geophysical logging completed by All Webb’s Enterprises, Inc. Completed surface facilities. Project included a final cased depth of 2712’ and a total depth of 3506’. Casing sizes used included 48” to 80’, 42” to 250’, 36” to 672’, 26” to 1994’, 16” to 2737’, and 10 3/8” to 2712’. <br />Completion Status: 100% <br />Total Contract Value: $5,100,000 <br />Jim McGrath (321)504-4046 <br />All Webb’s Enterprises, Inc.a.Jupiter, Florida Hydro-Geological <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3130
The URL can be used to link to this page
Your browser does not support the video tag.