Laserfiche WebLink
20. EXAMPLE PROJECT <br /> KEY NUMBER <br />04/2010-04/2013 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.)02 <br />23. PROJECT OWNER’S INFORMATION <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />21. TITLE AND LOCATION (City and State) <br />a. PROJECT OWNER <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETEDVenice Gardens Deep Injection Well - Venice Gardens, FL <br />Sarasota County <br />This project consists of construction of 24” Class 1 Industrial test injection well approximately 2,000’ deep using an electric drill rig. UIC Class I regulated. <br />Well Diameter & Depth: 24” well to 1300’, 18” well with FRP to 1300’ to 1500’. One 6” monitor well to 700 feet and one 6” monitor well to 900 feet. <br />Includes all labor, material, permits, equipment, drilling, packer testing, coring, geophysical logging, injection test and MIT. <br />Completion Status: 100% <br />Total Contract Value: $3,500,000 <br />Jack Gibson (941) 650-2606 <br />All Webb’s Enterprises, Inc.a.Jupiter, Florida Hydro-Geological <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3131