|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for Each key person.)
<br />19. RELEVANT PROJECTS
<br />12. NAME
<br />16. EDUCATION (Degree and Specialization)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />13. ROLE IN THIS CONTRACT
<br />a. TOTAL b. WITH CURRENT FIRM
<br />14. YEARS OF EXPERIENCE
<br />B.S., CIVIL ENGINEERING, UNIVERSITY OF CENTRAL FLORIDA
<br />Mr. Mahon has 12 years of engineering experience and is a project manager for various projects related to roadway, utility and land development projects in the Mid-Atlantic and South Florida regions. His project management experience includes site development, ADA accessibility, stormwater management, utility design, roadway deign, comprehensive master plans and investigations of storm and sanitary systems, permitting, bidding documents, and engineering during construction services. Mr. Mahon’s site development and highway design experience includes design for milling and resurfacing, widening, overbuild, reconstruction, utilities, ADA upgrades, drainage improvements, signing and pavement markings, traffic control plans, and storm water pollution prevention control plans. His experience also includes local agency program (L AP) coordination. In addition, Mr. Mahon has performed Site Plan Reviews for the City of Weston, City of West Park, City of Pembroke Pines, City of Pahokee, Town of Surfside, and Village of Estero.
<br />CALVIN, GIORDANO & ASSOCIATES, INC. - FORT LAUDERDALE, FL
<br />2014 2015-2017
<br />(1) TITLE AND LOCATION (City and State)
<br />a.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDDavie Road Phase 1 Davie, Florida
<br />Project engineer for Davie Road from SR 84 to Nova Dr. Coordinate with design team for the development of construction documents for the removal of exiting two-way turn lanes in the middle of the roadway and replace with landscape medians and dedicated turn lanes, roadway widening, sidewalk improvements to meet current ADA standards, add bike lanes, signalization at Nova Drive & Reese Road, pavement marking & signage for a six lane divided road, maintenance of traffic, drainage modifications, lighting, and tree removal/relocations. Review and respond to contractor provided shop drawings & RFI’s during construction. Project partially funded by a County Incentive Grant.
<br />Check if project performed with current firmX
<br />2014-2016 2016-2018
<br />(1) TITLE AND LOCATION (City and State)
<br />b.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDDavie Road Phase 2 Davie, Florida
<br />Project Manager and Engineer of Record for Davie Road from SW 39th Street to Nova Dr. Coordinate with design team for the development of construction documents for the removal of exiting two-way turn lanes in the middle of the roadway and replace with landscape medians and dedicated turn lanes, sidewalk improvements to meet current ADA standards, add bike lanes, signalization at SW 39th St and SW 37th St., pavement marking & signage for a four lane divided road, traffic control, lighting, and tree removal/relocations. Coordinate with design team to ensure project progresses on schedule. This included internal progress meetings, coordination with other disciplines, coordination efforts with client, budget control and invoice processing. Prepare and submit documents to comply with FDOT Local Agency Program (LAP) Funding requirements. Review and respond to contractor provided shop drawings & RFI’s during construction.
<br />Check if project performed with current firmX
<br />2016-2017 2017-2018
<br />(1) TITLE AND LOCATION (City and State)
<br />c.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDCooper City Hall Parking Lot ImprovementsCooper City, Florida
<br />Project Manager & Engineer of Record for the design and permitting for the parking lot improvements to the Cooper City Hall parking lot located within Cooper City, FL. Design includes milling and resurfacing with overbuild to the existing parking lot, reconfigure the parking stalls to maximize the number of parking spaces within the existing parking lot, drainage improvement, grading, signing and pavement marking plans.
<br />Check if project performed with current firm
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />NICHOLAS B. MAHON, PE CIVIL ENGINEER 12 4
<br />PE FLORIDA NO. PE78361
<br />90
|