<br />(1) TITLE AND LOCATION (City and State)
<br />d.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDFronton Blvd Roadway Improvements Dania Beach, Florida
<br />Project Manager and Engineer of Record for Fronton Blvd Roadway Improvements from Dania Beach Blvd to NE 2nd St. Coordinate with design team for the development of construction documents to upgrade an undivided two lane road and replace with landscape median, roadway widening, sidewalk improvements to meet current ADA standards, pavement marking & signage for a 3 lane divided road, drainage modifications and lighting. Review and respond to contractor provided shop drawings & RFI’s during construction.
<br />Check if project performed with current firmX
<br />2016-2018 2018-Present
<br />(1) TITLE AND LOCATION (City and State)
<br />e.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDAndrews Avenue Roadway Improvements Oakland Park, Virginia
<br />Project Manager & Engineer of Record for Andrews Avenue from Oakland Park Blvd to Prospect Drive. Coordinate with design team for the development of construction documents for the removal of exiting two-way turn lanes in the middle of the roadway and replace with landscape medians and dedicated turn lanes, reconstruction of existing sidewalks to meet current ADA standards, add bike lanes, mid-block crossings for pedestrians, pavement markings & signage for a four lane divided road, and lighting. Coordinate with design team to ensure project progresses on schedule. This included internal progress meetings, coordination with other disciplines, coordination efforts with client, budget control and invoice processing. Prepare and submit documents to comply with FDOT Local Agency Program (LAP) Funding requirements.
<br />Check if project performed with current firmX
<br />2016-2018 2018-Present
<br />(1) TITLE AND LOCATION (City and State)
<br />f.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDTamarac Bikeways Phase V & VITamarac, Florida
<br />Project Manager & Engineer of Record for NW 76th Street from University Drive to NW 70th Ave (Phase V), and NW 64th Avenue from NW 57th Street to Bailey Road (Phase VI). Coordinate with design team for the development of construction documents for the widening of the roadway to accommodate bike lanes and reconstruction of existing sidewalks to meet current ADA standards. Coordinate with design team to ensure project progresses on schedule. This included internal progress meetings, coordination efforts with client, budget control and invoice processing. Prepare and submit documents to comply with FDOT Local Agency Program (LAP) Funding requirements.
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />2015-2018 2018
<br />(1) TITLE AND LOCATION (City and State)
<br />g.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDDavie Road Phase 2 Corridor EnhancementsDavie, Florida
<br />Senior project manager for design for Davie Road from Nova Drive to SW 39th Street. The scope includes adding bike lanes and a landscaped median within the existing 5 lane pavement section, widening of the sidewalks, ADA upgrades, signalization upgrades, signing and pavement marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. The project is an FDOT Local Agency Program (LAP) funded grant project requiring coordination and submittals to FDOT, including using their electronic review comment (ERC) system, as required due to the federal funding. Post Design services for this federally funded project required close coordination with the FDOT and CEI team.
<br />Check if project performed with current firmX
<br />2016-2017 2017-2018
<br />(1) TITLE AND LOCATION (City and State)
<br />h.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETEDBamford Park Artificial Turf InstallationDavie, Florida
<br />Project Manager and Engineer of Record for the site improvements to convert two existing natural grass sport fields to artificial turf consisting of silt-film and to use a three layered heat reducing composite infill material of selected graded sand, S.B.R. crumb rubber or similar material and a top layer of composite material with heat reducing properties. The overall project included the design for installation of artificial turf and drainage system for Bronco and Mustang Fields, ADA compliant sidewalk improvements, grading and retaining wall design. The fields will serve multiple sports; Bronco field will have markings for Boy’s Football, full length soccer for 11vs11 (U13 onwards) and Men’s lacrosse; Mustang Field will have markings for full soccer for 11vs11 (U13 onwards), two small soccer fields for 9vs9 (up to U12) and full Men’s lacrosse. The project was permitted through the Central Broward Water Control District.
<br />Check if project performed with current firmX
<br />91
|