Laserfiche WebLink
G. <br />KEY PERSONNEL PARTICIPATION <br />IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, <br />Block 12) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, <br />Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in "Example Projects Key" section below before completing <br />table. Place "X" under project key number for <br />participation in same or similar role.) <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />Tom Mullin, PE <br />Chief Geotech Engineer <br />X <br />X <br />Greg Stelmack, PE <br />Principal Geotechnical Engineer <br />X <br />X <br />29. EXAMPLE PROJECTS KEY <br />NO. <br />TITLE OF EXAMPLE PROJECT (FROM SECTION F) <br />NO. <br />TITLE OF EXAMPLE PROJECT (FROM SECTION F) <br />I <br />Eastpointe Pump Station, <br />Palm Beach County, FL <br />6 <br />2 <br />G420 Pump Station Design of Turning Vane & Pump <br />Modifications, Miami -Dade County, FL <br />7 <br />3 <br />8 <br />4 <br />9 <br />5 <br />10 <br />RADISE <br />STANDARD FORM 330 <br />100 <br />