<br />Craig A. Smith & Associates, Inc.
<br />Engineers • Surveyors • Subsurface Utility Engineering
<br />3D Subsurface Imaging • Utility Coordination
<br />Scope of Work: Survey, utility locates, preparation of design plans, cost estimates, permitting,
<br />bidding, construction management and construction observation, survey as-builts and
<br />certification through project closeout for the construction of a 84 -inch drainage pipe, micro -
<br />tunneling, stormwater pump station with four (4) pumps (200 HP motors) each capable of 40
<br />CFS, a ditch along the Tri -Rail corridor construction and dredging at the C-10 canal. This
<br />project was on a fast track from preliminary design to construction; completion took only 25
<br />months. This project was completed on time and within budget.
<br />Design Cost (Including Construction Management): $666,589
<br />Construction Cost Estimate: $11,000,000
<br />Actual Construction Cost: $10,976,931
<br />Town of Pembroke Park - Park Road & SW 25th Street Stormwater Pump Station, Pembroke
<br />Park, Florida Status: Completed 2002
<br />Prime Consultant: CAS
<br />Key CAS Staff: Stephen C. Smith, William H. Landis, Tony Gomes
<br />Scope of Work: Planning, design, permitting, bidding and construction management and
<br />construction observation services as well as grants assistance for the construction of a 5 CFS
<br />stormwater pump station including catch basins, junction boxes, pump valve box and
<br />associated stormwater force main.
<br />Design Cost (including Construction Management): $38,000
<br />Construction Cost Estimate: $180,000
<br />Actual Construction Cost: $188,300
<br />City of Moore Haven Stormwater System Improvements, Moore Haven, Florida
<br />Status: Completed 2015
<br />Prime Consultant: CAS
<br />Key CAS Staff: Gene R. Schriner, Orlando A. Rubio, Robert D. Keener, James F. Driscoll,
<br />William Tanto
<br />Scope of Work: Planning, survey, utility locates, design, permitting bidding assistance and
<br />construction management and inspection services for The Ranch Lakes Estates Improvements
<br />Project for the City of Moore Haven which consisted of the construction of a gravity stormwater
<br />drainage system along with two (2) master stormwater pump stations including force mains
<br />and canal dredging. Construction included the installation of 7,103 linear feet of HDPE
<br />drainage pipe ranging in diameter from 15 -inch to 48 -inch, 1,044 linear feet of force main, 76
<br />drainage structures and two duplex stormwater pump stations. This project was completed on
<br />time and within budget.
<br />Design Cost (including Construction Management): $271,175
<br />Construction Cost Estimate: $2,000,000
<br />Actual Construction Cost: $2,031,000