<br />Scope of Work: The project consists of removal and replacement of existing failing catch
<br />basins and CMP drainage pipes on approximately 350 linear feet of roadway in the downtown
<br />Belle Glade area.
<br />Design Cost (including Construction Oversight): $57,800
<br />Construction Cost Estimate: $286,421
<br />Actual Construction Cost: TBD
<br />City of Moore Haven - Avenue R Stormwater Improvements, Moore Haven, Florida
<br />Status: Completed 2018
<br />Prime Consultant: CAS
<br />Key CAS Staff: Gene R. Schriner, James R. Orth, Orlando A. Rubio, Robert D. Keener, James F.
<br />Driscoll
<br />Scope of Work: Survey, utility locates, design, preparation of construction plans and contract
<br />document development, permitting, bidding, construction management, construction
<br />observation through project closeout/start-up services for the installation of 1,200 linear feet
<br />of plastic Swale liner (1/4 section of 12 -inch ID smooth inner wall perforated black P.E. pipe),
<br />350 linear feet of PVC culverts, ten (10) concrete headwalls, one (1) drainage structure, 4,000
<br />square yards of SOD and the regarding of 4,000 square yards of Swale. The project also
<br />involved the relocation of existing utilities. This project was 100% grant funded and completed
<br />on time and within budget.
<br />Design Cost (including Construction Management): $94,290
<br />Construction Cost Estimate: $340,000
<br />Actual Construction Cost: $393,304
<br />Spring Lake Improvement District Stormwater Treatment Area Project, Sebring, Florida
<br />Status: Completed 2017
<br />Prime Consultant: CAS
<br />Key CAS Staff: Gene R. Schriner, James R. Orth, Orlando A. Rubio, Robert D. Keener
<br />Scope of Work: Survey, design, stormwater modeling, cost estimating, contract document
<br />development and permitting for the construction of a 70 acre stormwater treatment area
<br />(STA) to provide additional water quality treatment benefits prior to discharging into Arbuckle
<br />Creek and provide added storage during rain events thus reducing flooding. Secured grants for
<br />this project were as follow: State Appropriation $416,000 and two 319 FDEP grants
<br />$1,250,000. The project was completed on time and within budget.
<br />Design Cost: $462,560
<br />Construction Cost Estimate: $3,300,000
<br />Actual Construction Cost: $3,304,579
<br />Glades County - Kirby Thompson Roadway & Drainage Improvements, Moore Haven, Florida
<br />Status: Completed 2016
<br />Prime Consultant: CAS
<br />Key CAS Staff: Gene R. Schriner, Robert D. Keener
<br />Scope of Work: Survey, design, contract document development, permitting, bidding,
<br />construction management and observation through project close-out for roadway resurfacing,
<br />drainage and striping for approximately four (4) miles along Kirby Thompson Road from the
<br />Hendry County line to County Road 720. CAS utilized a new state-of-the-art design saving
<br />money and time through the use of "Full Depth Reclamation", a process which is cost
<br />effective, providing a stronger pavement with a longer life.
<br />Design Cost (including Construction Management): $195,610