@�g <br />Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />Scope of Work: The project consists of removal and replacement of existing failing catch <br />basins and CMP drainage pipes on approximately 350 linear feet of roadway in the downtown <br />Belle Glade area. <br />Design Cost (including Construction Oversight): $57,800 <br />Construction Cost Estimate: $286,421 <br />Actual Construction Cost: TBD <br />City of Moore Haven - Avenue R Stormwater Improvements, Moore Haven, Florida <br />Status: Completed 2018 <br />Prime Consultant: CAS <br />Key CAS Staff: Gene R. Schriner, James R. Orth, Orlando A. Rubio, Robert D. Keener, James F. <br />Driscoll <br />Scope of Work: Survey, utility locates, design, preparation of construction plans and contract <br />document development, permitting, bidding, construction management, construction <br />observation through project closeout/start-up services for the installation of 1,200 linear feet <br />of plastic Swale liner (1/4 section of 12 -inch ID smooth inner wall perforated black P.E. pipe), <br />350 linear feet of PVC culverts, ten (10) concrete headwalls, one (1) drainage structure, 4,000 <br />square yards of SOD and the regarding of 4,000 square yards of Swale. The project also <br />involved the relocation of existing utilities. This project was 100% grant funded and completed <br />on time and within budget. <br />Design Cost (including Construction Management): $94,290 <br />Construction Cost Estimate: $340,000 <br />Actual Construction Cost: $393,304 <br />Spring Lake Improvement District Stormwater Treatment Area Project, Sebring, Florida <br />Status: Completed 2017 <br />Prime Consultant: CAS <br />Key CAS Staff: Gene R. Schriner, James R. Orth, Orlando A. Rubio, Robert D. Keener <br />Scope of Work: Survey, design, stormwater modeling, cost estimating, contract document <br />development and permitting for the construction of a 70 acre stormwater treatment area <br />(STA) to provide additional water quality treatment benefits prior to discharging into Arbuckle <br />Creek and provide added storage during rain events thus reducing flooding. Secured grants for <br />this project were as follow: State Appropriation $416,000 and two 319 FDEP grants <br />$1,250,000. The project was completed on time and within budget. <br />Design Cost: $462,560 <br />Construction Cost Estimate: $3,300,000 <br />Actual Construction Cost: $3,304,579 <br />Glades County - Kirby Thompson Roadway & Drainage Improvements, Moore Haven, Florida <br />Status: Completed 2016 <br />Prime Consultant: CAS <br />Key CAS Staff: Gene R. Schriner, Robert D. Keener <br />Scope of Work: Survey, design, contract document development, permitting, bidding, <br />construction management and observation through project close-out for roadway resurfacing, <br />drainage and striping for approximately four (4) miles along Kirby Thompson Road from the <br />Hendry County line to County Road 720. CAS utilized a new state-of-the-art design saving <br />money and time through the use of "Full Depth Reclamation", a process which is cost <br />effective, providing a stronger pavement with a longer life. <br />Design Cost (including Construction Management): $195,610 <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 <br />159 <br />