<br />Craig A. Smith & Associates, Inc.
<br />Engineers • Surveyors • Subsurface Utility Engineering
<br />3D Subsurface Imaging • Utility Coordination
<br />Construction Cost Estimate- $1,500,000
<br />Actual Construction Cost: $1,679,114
<br />• Town of Pembroke Park - SW 31st Avenue Stormwater Improvements, Pembroke Park,
<br />Florida
<br />Status: Completed 2016
<br />Prime Consultant: CAS
<br />Key CAS Staff: Stephen C. Smith, Frank Vilar, Robert D. Keener, Tony Gomes, William Tanto
<br />Scope of Work: Survey and design of a stormwater management system to serve an existing
<br />1.2 acre commercial/residential flood prone area in the Town of Pembroke Park. Proposed
<br />improvements included 2,050 linear feet of roadway improvements by re -grading the existing
<br />roadway from a crowned road to an inverted crown section and included addition of
<br />approximately 1,800 linear feet of exfiltration trench. Additional project related
<br />responsibilities included pavement marking & signage, permitting, cost estimating and
<br />preparation of the construction contract documents and bidding services. Construction
<br />services were also provided and included shop drawing reviews, review and approval of pay
<br />requests, general construction management, field inspections to review Contractor installation
<br />of proposed work and final certification to all regulatory agencies through project close-out.
<br />This project was completed on time and within budget.
<br />Desla:n Cost: $56,000
<br />Construction Cost Estimate: $833,000
<br />Actual Construction Cost. $565,000
<br />• City of Belle Glade -NW Avenue H Roadway and Drainage Improvements, Belle Glade, Florida
<br />Status: Completed 2015
<br />Prime Consultant: CAS
<br />Key CAS Staff: Gene R. Schriner, Robert D. Keener
<br />Scope of Work: The project consisted of survey, design and contract document development
<br />for a half -mile of roadway reconstruction pavement resurfacing, drainage pipe upgrades,
<br />swale restoration, striping and signage. Professional services included survey, engineering
<br />design and development of construction plans, cost estimates, preparation of bid schedule
<br />and bidding assistance.
<br />Design Cost: $48,725
<br />• City of Belle Glade -SE Avenue K Roadway and Drainage Improvements, Belle Glade, Florida
<br />Status: Completed 2015
<br />Prime Consultant: CAS
<br />Key CAS Staff: Gene R. Schriner, Robert D. Keener
<br />Scope of Work: The project consisted of survey, design and contract document development
<br />for a quarter -mile of roadway reconstruction pavement resurfacing, drainage pipe upgrades,
<br />Swale restoration, striping and signage. Professional services included survey, engineering
<br />design and development of construction plans, cost estimates, preparation of bid schedule
<br />and bidding assistance.
<br />Design Cost: $37,340
<br />• City of Okeechobee Southwest Area Drainage Improvements, Okeechobee, Florida
<br />Status: Completed 2013
<br />Prime Consultant: CAS
<br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110