My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering • 31) Subsurface Imaging • Utility Coordination <br />CITY OF SWEETWATER <br />STORMWATER & PUMP STATION <br />IMPROVEMENTS PHASE IV <br />Project Description: <br />Due to repetitive, historical flooding within the 138 acre <br />residential area, Phase IV Stormwater Improvements for the <br />City of Sweetwater received substantial HMGP funding from <br />FEMA. The projects consisted of 130 structures, 10,795 <br />linear feet of drainage pipe ranging in size from 15 -inch to <br />72 -inch, 1,506 linear feet of 30 -inch force main and 2 -triplex <br />pumping stations (28 HP). Design fees for the project were <br />$403,151. The $4.09M project began in May 2011 and was <br />completed in August 2013 with no liquidated damages. <br />Responsibilities: <br />Surveying, utility locating, FEMA grant applications, planning, <br />design, cost estimates, preparation of construction plans and <br />contract documents, permitting, bidding, construction management and limited engineering <br />services during construction. The project was inspected and certified by the City Engineer's <br />office. <br />Key Personnel: <br />Stephen C. Smith, P.E. - Senior Vice President; Robert D. Keener, P.S.M. - Vice President of <br />Survey; Orlando A. Rubio, P.E. - Senior Supervising Engineer; Al Caruso, E.I. - Project Manager; <br />James Driscoll - Director of SUE; Tony Gomes - Senior Field Representative <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 <br />166 <br />
The URL can be used to link to this page
Your browser does not support the video tag.