Laserfiche WebLink
47 <br />1 I TITLE AND LOCATION (City and StateJ <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/Applicable) <br />Sunshine Water Control District (SWCD) <br />Nest Outfall Canal Improvements <br />2014 <br />Ongoing <br />oral Springs, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.JAND SPECIFIC ROLE XCheck if project performed with current firm <br />oject Manager: Conceptual hydraulic modeling of a 2 -mile primary canal of the SWCD. <br />hase 1 design, permitting, modeling, bidding, community outreach, and construction <br />F <br />anagement of the $1.5 million project. <br />1) TITLE AND LOCATION (City and StateJ <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (// <br />Applicable) <br />Pring Lake Improvement District (SLID) <br />tormwater Treatment Area <br />d <br />Sebring, Florida <br />2014 <br />2017 <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Manager: Obtained initial project funding from FDEP. Design, permitting, <br />modeling, bidding and construction management of a $3.3 million project. Report for <br />FDEP. <br />1) TITLE AND LOCATION (City and StateJ <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (IfAppliceb/e) <br />Stormwater System Improvements <br />Moore Haven, Florida <br />2011 <br />2015 <br />e <br />3) BRIEF DESCRIPTION (Briefscope, size, cost etc.JAND SPECIFIC ROLE X Check if project performed with current firm <br />Planning, survey, utility locates, design, permitting, bidding assistance and <br />construction management and inspection services for the Ranch Lakes Estates <br />Improvements project for the City of Moore Haven which consisted of the construction <br />of a gravity stormwater drainage system along with two (2) master stormwater pump <br />stations including force mains and canal dredging. Construction included the <br />installation of 7,103 linear feet of HDPE drainage pipe ranging in diameter from 15 -inch <br />to 48 -inch, 1,044 LF of force main, 76 drainage structures and two duplex stormwater <br />pump stations. <br />1) TITLE AND LOCATION (Cityand StateJ <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (lfApplicab/e) <br />Stormwater & Pump Station Improvements Phase <br />IV <br />2011 2013 <br />f <br />Sweetwater, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current frm <br />Due to repetitive, historical flooding within the 138 acre residential area, Phase IV <br />Stormwater Improvements for the City of Sweetwater received substantial HMGP <br />funding from FEMA. The projects consisted of 130 structures, 10,795 linear feet of <br />drainage pipe ranging in size from 15 -inch to 72 -inch, 1,506 linear feet of 30 -inch force <br />main and two (2) triplex stormwater pumping stations (28 HP). Construction cost: <br />$4.09 Million <br />47 <br />