My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
48 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/f <br />Applicable) <br />Kase IV Stormwater Improvements <br />p <br />2010 <br />On-going <br />ity of Sweetwater, Florida <br />9 <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Manager: Design and permitting of stormwater retrofit project ($3.8M). <br />Preparation of construction plans, bid schedule, cost estimate, bidding assistance and <br />engineering services for the ongoing construction. <br />1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICE$ <br />CONSTRUCTION (/fApplicable) <br />Town of Golden Beach CIP Phase III & IV <br />Stormwater Collection System with Master Pump <br />h <br />Stations <br />2009 <br />2011 <br />Golden Beach, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />The project Consisted of a stormwater master pump station, 14,500 linear feet of DIP <br />drainage pipe and stormwater force main ranging in size from 16 -inch to 72 -inch. <br />Construction cost: $7,667,276 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/f <br />Applicable) <br />Improvements <br />olden Beach Stormwater Im p <br />2008 <br />2012 <br />ft <br />olden Beach, Florida <br />I <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Manager: Design and permitting of a stormwater retrofit ($6.0 million). Prepared <br />cost estimated, bid schedule, provided bidding assistance and FEMA grant application <br />documentation. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />FDOT 1-95 Stormwater Pump Station <br />Pembroke Park, Florida <br />2001 <br />2002 <br />1 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Survey, utility locates, preparation of design plans, cost estimates, permitting, bidding, <br />construction management and construction observation, survey as-builts and <br />certification through project close-out for the Interstate 95 Pump Station project, <br />located within Pembroke Park. The project was designed to alleviate flooding in both <br />Pembroke Park and Hallandale Beach and was paid for by FDOT. The project included <br />an 84 -inch drainage pipe, micro -tunneling, pump station with four (4) pumps (200 HP <br />motors) each capable of 40 CFS, a ditch along the Tri -Rail corridor construction and <br />dredging at the C-10 canal. This project was on a fast track from preliminary design to <br />construction; completion took only 25 months. Project Cost: $10,976,931 <br />48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.