Laserfiche WebLink
50 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/fAp /icab/e) <br />Town of Golden Beach CIP Phase III & IV <br />Stormwater Collection System with Master Pump <br />d <br />Stations <br />2009 <br />2011 <br />Golden Beach, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />The project Consisted of a stormwater master pump station, 14,500 linear feet of DIP <br />drainage pipe and stormwater force main ranging in size from 16 -inch to 72 -inch. <br />Construction cost: $7,667,276 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If Applicable) <br />Park Road & SW 25`h Street Pump Station <br />Pembroke Park, Florida <br />2002 <br />2002 <br />e <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,)AND SPECIFIC ROLE X Check if project performed with current firm <br />Planning, design, permitting, bidding and construction management and construction <br />observation services as well as grants assistance for the Park Road and SW 25th Street <br />Pump Station project for the Town of Pembroke Park. The project consists of the <br />construction of a 5 CFS stormwater pump station including catch basins, junction <br />boxes, pump valve box and stormwater force main. Project Cost: $188,300 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION(/fApp/icab/e) <br />FDOT 1-95 Stormwater Pump Station <br />Pembroke Park, Florida <br />2001 <br />2002 <br />f <br />3) BRIEF DESCRIPTION (Brief scope, size, cost etc)AND SPECIFIC ROLE X Check if project performed with current firm <br />Survey, utility locates, preparation of design plans, cost estimates, permitting, bidding, <br />construction management and construction observation, survey as-builts and <br />certification through project close-out for the Interstate 95 Master Stormwater Pump <br />Station project, located within Pembroke Park. The project was designed to alleviate <br />flooding in both Pembroke Park and Hallandale Beach and was paid for by FDOT. The <br />project included an 84 -inch drainage pipe, micro -tunneling, pump station with four (4) <br />pumps (200 HP motors) each capable of 40 CFS, a ditch along the Tri -Rail corridor <br />construction and dredging at the C-10 canal. This project was on a fast track from <br />preliminary design to construction; completion took only 25 months. Project Cost: <br />$10,976,931 <br />50 <br />