Laserfiche WebLink
12. NAME 13. ROLE IN THIS CONTRACT <br />1) TITLE AND LOCATION (City and State) <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />b. WITH CURRENT FIRM <br />William H. Landis, P.E. Project Engineer— Stormwater <br />Palm &Hibiscus Island Stormwater &Roadway <br />I 50 <br />38 <br />15. FIRM NAME AND LOCATION (City and State) <br />2015 <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B.S. Mechanical Engineering, 1962 <br />Professional Engineer <br />Drexel University, Philadelphia, PA <br />State of Florida <br />Improvement Project structured as a design/build with Lanzo Construction. CAS was <br />License No. 47801 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT <br />PROJECTS <br />49 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION pfApp/icab/e) <br />Palm &Hibiscus Island Stormwater &Roadway <br />a <br />Improvements <br />Miami Beach, Florida <br />2015 <br />Ongoing <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Survey, engineering stormwater design, drainage calculations and modeling, cost <br />estimates, permitting, and engineering services during construction for the Palm and <br />Hibiscus Island Stormwater and Roadway Improvements. The project is a Capital <br />Improvement Project structured as a design/build with Lanzo Construction. CAS was <br />responsible for the drainage system, roadway design and harmonization components <br />of the CIP. The design incorporated engineering techniques to reduce future sea level <br />rises such as elevating the existing roadways, increasing the size of the drainage <br />system, providing water quality, installing three (3) stormwater pump stations and <br />backflow prevention devices to avoid extreme high tides from re-entering the systems. <br />Work also included electric and communication line conversion from overhead to <br />underground on Hibiscus Island. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If <br />Applicable) <br />al Harbour Force Main Project <br />I <br />2011 <br />1 2011 <br />al Harbour, Florida <br />b <br />3) BRIEF DESCRIPTION (Briefscope, size, cost etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Manager: Planning, design, permitting, preparation of construction plans, <br />idding and construction management for 12,000 LF of 16" force main trunk line to <br />ervice the entire Village to pump all raw sewage to Miami Beach. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/tAppticab/e) <br />al Harbour Collins Avenue Water Main <br />al Harbour, Florida <br />2011 <br />2013 <br />C <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />roject Manager: Replacement and upsizing of an existing 8" CIP water main with a <br />ew 12" HDPE and DIP water main that will serve the ocean front high-rise buildings. <br />49 <br />