Laserfiche WebLink
6% <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfA plicable) <br />018 Water Main Improvements <br />Margate, Florida <br />2018 <br />N/A <br />e <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />oute surveys for water main expansion, replacements and relocations. Utility locating <br />nd test holes were included. <br />11 TITLE AND LOCATION (City and State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION(/fAppticab/e) <br />unshine Water Control District <br />West Outfall Canal Improvements <br />2018 <br />N/A <br />' <br />Coral Springs, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />Topographic survey for canal improvements on two phases of project, including <br />stormwater pump station. <br />1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfA plicabie) <br />Pring Lake Improvement District <br />otable Water & Sewer Expansion <br />2017 <br />N/A <br />s <br />lighlands County, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />oute surveys for sewer force main and potable water main expansion. Survey for new <br />wastewater treatment plant facility. Sketch and legal descriptions for utility easements <br />were also prepared. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />Stormwater System Improvements <br />Moore Haven, Florida <br />2011 <br />2015 <br />h <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Survey, utility locating services for the Ranch Lakes Estates Improvements project for <br />the City of Moore Haven which consisted of the construction of a gravity stormwater <br />drainage system along with two (2) master stormwater pump stations including force <br />mains and canal dredging. Construction included the installation of 7,103 linear feet of <br />HDPE drainage pipe ranging in diameter from 15 -inch to 48 -inch, 1,044 LF of force main, <br />76 drainage structures and two duplex stormwater pump stations. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (lfA plicablel <br />Stormwater & Pump Station Improvements Phase <br />2011 2013 <br />IV <br />Sweetwater, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Due to repetitive, historical flooding within the 138 acre residential area, Phase IV <br />Stormwater Improvements for the City of Sweetwater received substantial HMGP <br />funding from FEMA. The projects consisted of 130 structures, 10,795 linear feet of <br />drainage pipe ranging in size from 15 -inch to 72 -inch, 1,506 linear feet of 30 -inch force <br />main and two (2) triplex stormwater pumping stations (28 HP). Construction cost: <br />$4.09 Million <br />6% <br />