Laserfiche WebLink
53 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/fA p/icab/e) <br />Town of Golden Beach CIP Phase III & IV <br />Stormwater Collection System with Master Pump <br />j <br />Stations <br />2009 <br />2011 <br />Golden Beach, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Surveying services for the design and construction of stormwater master pump <br />station, 14,500 linear feet of DIP drainage pipe and stormwater force main ranging in <br />size from 16 -inch to 72 -inch. Construction cost: $7,667,276 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION AfAp ticabte) <br />FDOT 1-95 Stormwater Pump Station <br />2001 <br />2002 <br />Pembroke Park, Florida <br />k <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Survey, utility locates, and survey as-builts for the Interstate 95 Pump Station project, <br />located within Pembroke Park. The project was designed to alleviate flooding in both <br />Pembroke Park and Hallandale Beach and was paid for by FDOT. The project included <br />an 84 -inch drainage pipe, micro -tunneling, pump station with four (4) pumps (200 HP <br />motors) each capable of 40 CFS, a ditch along the Tri -Rail corridor construction and <br />dredging at the C-10 canal. This project was on a fast track from preliminary design to <br />construction; completion took only 25 months. Project Cost: $10,976,931 <br />53 <br />