My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
55 <br />( 1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If <br />Applicable] <br />Town of Davie <br />Ongoing <br />I N/A <br />e <br />Davie, Florida <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Continuing contract for utility locating services for the Town's service area on an as - <br />needed basis. <br />( 1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (IfApplicable) <br />City of Cooper City <br />Cooper City, Florida <br />Ongoing <br />N/A <br />f <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Continuing contract for utility locating services for the City's service area on an as - <br />needed basis. <br />( 1)TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION(IfApp/icab/e) <br />Bal Harbour Village <br />Bal Harbour Village, Florida <br />2014 <br />2016 <br />9 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Various survey mapping and construction projects for the expansion and/or <br />rehabilitation of utilities (pipelines and wastewater lift stations), acting as the Village <br />Engineers, projects include Collins Avenue (SR A1A) from 73'd Street to 96th Street and <br />96th Street to the Haulover cut (approximately 3 miles) and rehabilitation of Lift Station <br />No. 1 and installation of Lift Station No. 3. Also included is ongoing surveying as <br />needed and a major route survey for the rehabilitation of the Village utility system and <br />roadways (approximately 3 miles lineally). Survey of recreation and public works area. <br />( 1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (IfApplicable) <br />The WAVE - Modern Streetcar <br />Fort Lauderdale, Florida <br />2014 N/A <br />In <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />CAS was tasked with performing complete 3D Radar Tomography Enhanced <br />Subsurface Utility Engineering services, 3D CADD Modeling of existing utility systems, <br />creation of an existing surface model based off the 5' x 5' topo points collected through <br />the 3D RT process. CAS provided a complete subsurface model to assist in the <br />development of utility relocation planning and establishment of new utility corridors. <br />Project fee $614,000 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/!Applicable) <br />Stormwater System Improvements <br />Moore Haven, Florida <br />2011 <br />2015 <br />) <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Survey, utility locating services for the Ranch Lakes Estates Improvements project for <br />the City of Moore Haven which consisted of the construction of a gravity stormwater <br />drainage system along with two (2) master stormwater pump stations including force <br />mains and canal dredging. Construction included the installation of 7,103 linear feet of <br />HDPE drainage pipe ranging in diameter from 15 -inch to 48 -inch, 1,044 LF of force main, <br />76 drainage structures and two duplex stormwater pump stations. <br />55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.