Laserfiche WebLink
1) TITLE AND LOCATION (City and State) <br />Stormwater & Pump Station Improvements Phase PROFESSIONAL; <br />IV <br />2011 <br />Sweetwater, Florida <br />BRIEF DESCRIPTION (Briefscope, size, cost etc.)AND SPECIFIC ROLE <br />2013 <br />X Check if project performed with current firm <br />Utility locating services for the design and construction of 130 structures, 10,795 linear <br />feet of drainage pipe ranging in size from 15 -inch to 72 -inch, 1,506 linear feet of 30 -inch <br />force main and 2 -triplex pumping stations (28 HP). Construction cost: $4.09 Million <br />56 <br />