Laserfiche WebLink
15, FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />A.A. Business Management <br />University of Massachusetts, Amherst <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Survey Courses - University of Miami <br />Licensure - Asphalt Plant Tech FDOT #R-1712, Asphalt Roadway Tech FDOT #5659 <br />19. RELEVANT PROJECTS <br />59 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />tormwater Ponds Bank Repairs <br />alnut Creek Community Development District <br />2018 <br />2018 <br />a <br />WCDD) Pembroke Pines, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />esponsible for daily construction observation/inspection of 18,216 linear feet of <br />1eofabric tubes, 103,000 plants and 15,000 square yards of sod. Construction cost were <br />594,600. <br />1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION(/fApp/icab/e) <br />al Harbour Sanitary Improvements Phase I <br />al Harbour, Florida <br />2016 2017 <br />b <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />esponsible for daily construction observation/inspection for the installation of a triplex <br />ubmersible lift station and 1,350 linear feet of 18" gravity sewer main. Total <br />onstruction costs were $2,970,000. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (t(A plicable) <br />E 1741h Street Stormwater and Pavement <br />mprovements <br />2012 <br />2017 <br />unny Isles Beach, Florida <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE XCheck if project performed with current firm <br />esponsible for daily construction observation/inspection, pay applications and project <br />loseout for the restoration of 0.2 miles of roadway and drainage improvements. <br />onstruction costs totaled $2.14 million. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If <br />Applicable) <br />Capital Improvement Project <br />olden Beach Ca p p 1 <br />2012 <br />2012 <br />olden Beach, Florida <br />d3) <br />BRIEF DESCRIPTION (Brief scope, size, cost etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />esponsible for daily construction observation/inspection of $17.5M project including <br />tormwater, water main, electrical, pavement, sidewalk and landscaping improvements. <br />59 <br />