Laserfiche WebLink
RN <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (lfAp licable) <br />Stormwater & Pump Station Improvements Phase <br />2011 2013 <br />IV <br />e <br />Sweetwater, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation/inspection of 130 structures, 10,795 <br />linear feet of drainage pipe ranging in size from 15 -inch to 72 -inch, 1,506 linear feet of <br />30 -inch force main and 2 -triplex pumping stations (28 HP). Construction cost: $4.09 <br />Million <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />Town of Golden Beach CIP Phase III & IV <br />Stormwater Collection System with Master Pump <br />f <br />Stations <br />2009 <br />2011 <br />Golden Beach, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for the daily construction observation/inspection of a stormwater master <br />pump station, 14,500 linear feet of DIP drainage pipe and stormwater force main <br />ranging in size from 16 -inch to 72 -inch. Construction cost: $7,667,276 <br />1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/fA plicable) <br />Park Road & SW 25th Street Pump Station <br />Pembroke Park, Florida <br />2002 <br />2002 <br />9 <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.)ANO SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation/inspection of a 5 CFS stormwater pump <br />station including catch basins, junction boxes, pump valve box and stormwater force <br />main. Project Cost: $188,300 <br />1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (lfApplicable) <br />FDOT 1-95 Stormwater Pump Station <br />Pembroke Park, Florida <br />2001 <br />2002 <br />h <br />3) BRIEF DESCRIPTION (Brief scope, size, cost etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for the daily construction observation/inspection of an 84 -inch drainage <br />pipe, micro -tunneling, pump station with four (4) pumps (200 HP motors) each capable <br />of 40 CFS, a ditch along the Tri -Rail corridor construction and dredging at the C-10 <br />canal. This project was on a fast track from preliminary design to construction; <br />completion took only 25 months. Project Cost: $10,976,931 <br />RN <br />