My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />NE 1741h Street Stormwater and Pavement Improvements PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Sunny Isles Beach, Florida 2014 2016 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT <br />City of Sunny Isles Beach I Christopher Russo <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, endcost) <br />C. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 792-1776 <br />Survey, utility locates, preparation of engineering design and construction plans, stormwater modeling and <br />calculations, cost estimates, contract documents and permitting for the Roadway Improvements Project for NE <br />1741h Street. The project consists of a reconstruction of both the drainage and the road for approximately 0.2 miles <br />from Collins Avenue to North Bay Road. The existing roadway system was failing due to poor soil conditions, a <br />limited drainage system and an undersized outfall. The new roadway incorporated a reconstructed base with <br />geotech fabric to offset the soils. The design also included a new drainage system that meets water quality <br />requirements, site demolition, road regrading, fibre optic relocation, future conduit for telecom lines, sidewalks and <br />paver walkways, landscaping, curbing, bike paths and parallel parking. The design was completed within two <br />years, under budget, at a cost of $212,180. Construction of the first half of the project has been competed in 2016 <br />with an estimated cost of $2,147,800. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS, PROJECT <br />62 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />a. <br />Craig A. Smith & Associates, <br />Boca Raton, Florida <br />Prime Consultant <br />Inc. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandStete) <br />(3) ROLE <br />C. <br />62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.