Laserfiche WebLink
15, FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Atlantic Vocational Technical Center; <br />Architectural and Mechanical Drafting <br />Auto CADD 12 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />61 <br />1) TITLE AND LOCATION /City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION Of <br />A /icable) <br />thWidening/Milling/Resurfacing <br />NW/NE 87 Street <br />On-going <br />I On-going <br />EI Portal, Florida <br />a <br />3) BRIEF DESCRIPTION /Briefscope, size, cost etc./ AND SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for the daily construction observation/inspection and reporting for the <br />widening and resurfacing of NW/NE 87' Street. An FDOT LAP funded project valued at <br />$500,000. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />SERVICES TCONSTRUCTION WApp//Cab/e) <br />PROFESSIONAL <br />Stormwater System Improvements <br />Moore Haven, Florida <br />2011 2015 <br />b <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for the daily construction observation/inspection of a gravity stormwater <br />drainage system along with two (2) master stormwater pump stations including force <br />mains and canal dredging. Construction included the installation of 7,103 linear feet of <br />HDPE drainage pipe ranging in diameter from 15 -inch to 48 -inch, 1,044 LF of force main, <br />76 drainage structures and two duplex stormwater pump stations. <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (lfAppllcable) <br />Bal Harbour Force Main Installation <br />Bal Harbour, Florida <br />2012 2012 <br />C <br />3) BRIEF DESCRIPTION (Briefscope, size, cost, etcJAND SPECIFIC ROLE XCheck if project performed with current firm <br />Responsible for daily construction observation/inspection of $3.2M project, including <br />the construction of 2.5 miles of sewer force main and other restoration required. <br />1) TITLE AND LOCATION (City and State) <br />12) YEAR <br />COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (/f App/icab/e) <br />Town of Golden Beach CIP Phase III & IV <br />Stormwater Collection System with Master Pump <br />d <br />Stations <br />2009 <br />2011 <br />Golden Beach, Florida <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for the daily construction observation/inspection of a stormwater master <br />pump station, 14,500 linear feet of DIP drainage pipe and stormwater force main ranging <br />in size from 16 -inch to 72 -inch. Construction cost: $7,667,276 <br />61 <br />