My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXAMPLE PROJECT KEY <br />NUMBER <br />21. TITLE AND LOCATION (City and State) 22.) <br />Stormwater & Pump Station Improvements Phase IVFESSIONAL SERVICES <br />r <br />Sweetwater, Florida 2011 <br />V. PROJECT OWNER <br />City of Sweetwater <br />23. PROJECT OWNER'S INFORMATION <br />POINT OF CONTACT <br />Eric Gomez, P.E. <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (lnciudescope, six, andc"d <br />(if applicable) <br />2013 <br />X. POINT OF CONTACT TELEPHONE NUMBER <br />(305)553-5457 <br />Provided surveying, utility locating, FEMA grant applications, planning, design, cost estimates, preparation of <br />construction plans and contract documents, permitting, bidding, construction management and limited engineering <br />services during construction. The project was inspected and certified by the City Engineer's office. Due to <br />repetitive, historical flooding within the 138 acre residential area, Phase IV Stormwater Improvements for the City of <br />Sweetwater received substantial HMGP funding from FEMA. The projects consisted of 130 structures, 10,795 <br />linear feet of drainage pipe ranging in size from 15 -inch to 72 -inch, 1,506 linear feet of 30 -inch force main and two <br />(2) triplex stormwater pumping stations (28 HP). <br />Project Cost: $4,090,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />M <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />a. <br />Craig A. Smith & Associates, <br />Boca Raton, Florida <br />Prime Consultant <br />Inc. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State; <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />C. <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.