Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Stephen Bailey <br />15. FIRM NAME AND LOCATION (Cdv and State) <br />Bailey Engineering Consultants, Inc. (Orlando, FL ) <br />16. EDUCATION (DEGREEAND SPECIALIZATION) <br />Bachelors of Electrical Engineering <br />Georgia Institute of Technology/1983 <br />13. ROLE IN THIS CONTRACT <br />Chief Electrical Engineer <br />TOTAL b. WrrH CURRENT FIRM <br />32 1 23 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE) <br />Florida Professional Engineer #42461 <br />New York Professional Engineer #94774 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. ONanianons. Training, Awards. etc.) <br />National Society of Professional Engineers (NSPE); Institute of Electrical and Electronic <br />Engineers (IEEE); Florida Engineering Society (FES); National Fire Protection Association <br />(NFPA); Instrument Society of America (ISA). <br />79. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />77 <br />(11 TITLE AND LOCATION (Cdvand State) <br />V PLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (IfaMficable) <br />Sweetwater Stormwater Improvements Phase 4 <br />Sweetwater, Florida <br />2012 2014 <br />(3) BRIEF DESCRIPTION (BdefsoaDe. size. cost. etc.) AND SPECIFIC ROLE Check if pmiw performed with current firm <br />a. <br />Bailey Engineering provided the electrical and control system design for the stormwater system for the City. A new 200 amp <br />480 service and emergency generator was provided. <br />(1) TITLE AND LOCATION 0tv and State) <br />(2) YEAR PMPLETEO <br />PROFESSIONAL SERVICES CONSTRUCTION (Ifappllaable) <br />Margate Lift Station No. 22 <br />Margate, FL <br />2014 2015 <br />(3) BRIEF DESCRIPTION 1&iaf scone. size. cost. etc.) AND SPECIFIC ROLE Check if proied performed with currant fine <br />b. <br />BEC provided design of the electrical and control system for the duplex lift station improvements in accordance with the City <br />standards. Our design included solid state starters for the pump motors. <br />01 TITLE AND LOCATION fCdv and State) <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />Froward County Lift Stations 50N & 50M I <br />Broward County, FL <br />I Ongoing <br />TBD <br />(3) BRIEF DESCRIPTION (D'ief scope, size, cost, etc.) AND SPECIFIC ROLE Check if oroiect performed with current firm <br />p, <br />Bailey Engineering Consultants, Inc. was contracted to provide electrical, instrumentation and control design associated with the <br />replacement of two (2) lift stations. Each lift station is a duplex pump station with across the line starters for each pump. Our scope <br />included design of the Pump Control Panel (PCP), a Remote Telemetry Unit (RTU) and a portable standby generator. <br />(1) TIRE AND LOCATION (Cdv and State) <br />R <br />PQMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION(Ifawicable) <br />Tindall Hammock W/WWTP Improvements <br />Davie, Florida <br />1 2015 <br />2016 <br />d. <br />(3) BRIEF DESCRIPTION fflnef scope, size, cost, etc.) AND SPECIFIC ROLE W Check if oroiect oerfomled with current firm <br />Bailey Engineering Consultants, Inc. (BEC) provided electrical, control system design and construction management services <br />associated with the electrical system for the water and wastewater facilities, providing EPA Class 1 reliability <br />11) TITLE AND LOCATION (Ckv and State) <br />WYEAR, MPLETED <br />PROFESSIONAL SERVICESCONSTRUCTION <br />(Ifapplicable) <br />Groveland Lift Station No. 18 <br />Groveland, FL <br />2015 <br />2015 <br />(3) BRIEF DESCRIPTION IBrlefscpoe. size. cost. efc.) AND SPECIFIC ROLE Check aorp)ed performed with wrrent firm <br />a. <br />BEC provided design for a permanent standby generator for Groveland LS No. 18. This included design associated with the <br />proposed duplex lift station. The design was based on the installation of two (2) 40 -horsepower pumps with across the line <br />starters. Our services also included the design of the Pump Control Panel system and a VT SCADA RTU. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />77 <br />