Laserfiche WebLink
12. NAME <br />Jay Libo-on <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13, ROLE IN THIS CONTRACT <br />Engineer Intent <br />15. FIRM NAME AND LOCATION (Cdv and State) <br />Bailey Engineering Consultants, Inc. (Cooper City, FL) <br />16. EDUCATION MEGREEAND SPECIALIZATION) <br />Bachelors of Science in Electrical Engineering <br />Florida Atlantic University/1999 <br />TOTAL b. WITH CURRENT FIRM <br />IS 1 18 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida Engineer Intem No. 1100006452 <br />18. OTHER PROFESSIONAL QUALIFICATIONS MutNMations. Ormnihoitions. Tralnlno. Awards. etc.) <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 812016) PAGE 3 <br />78 <br />(1) TITLE AND LOCATION (CIN and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />Margate W WTP Lift Station Improvements <br />Margate, FL <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scone, size, coat. etc.) AND SPECIFIC ROLE Check If project performed with wrrent fine <br />a, <br />Bailey Engineering Consultants, Inc. was contracted to provide electrical engineering design associated with the lift station <br />improvements, including a new 480 volt triplex control panel with I0 -horsepower pumps. <br />(1) TITLE AND LOCATION (CRY and State) <br />MPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplkable) <br />Palm Coast Old Kings Road Master Lift Station <br />Palm Coast, FL <br />2014 <br />2015 <br />(3) BRIEF DESCRIPTION (eriefscooe. she. cost. etc) AND SPECIFIC ROLE Check if project performed with current firm <br />b. <br />Design of electrical and control system for the lift station improvements in accordance with the City standards. BEC reviewed the <br />existing electrical design and updated drawings accordingly to meet all current applicable codes. There were three (3) 50 - <br />horsepower pumps on site, and the standby generator system was sized to support two (2) pumps. <br />(D TITLE AND LOCATION (Cdv and Share)YEAR <br />OMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (inapplicable) <br />Groveland Lift Station No. 18 <br />Groveland, FL <br />2015 2015 <br />e. <br />(3) BRIEF DESCRIPTION (Brief scooe. she. cost. etc.) AND SPECIFIC ROLE Check 6 project performed wjth current firth <br />BEC provided design for a permanent standby generator for Groveland LS No. 18. This included design associated with the <br />proposed duplex lift station. The design was based on the installation of two (2) 40 -horsepower pumps with across the line <br />starters. Our services also included the design of the Pump Control Panels stem and a VT SCADA RTU. <br />(1) TITLE AND LOCATION (Ckv and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (Ifappfmable) <br />Clermont Lift Station No. E4 Replacement <br />Clermont, Florida <br />2013 2015 <br />d. <br />(3) BRIEF DESCRIPTION (Brief stype. size. cost. erc.) AND SPECIFIC ROLE LKJ Check If prdect performed whh wrtent firm <br />BEC provided design associated With the proposed triplex lift station. The design was based on the installation of two (2) 120 HP <br />pumps and one (1) 60 HP pump. All of the pumps were VFD driven With soft start bypass. Our design reused the existing VFDs. A <br />new PCP was provided with pump bypass, contactors and PLC. This enclosure was ventilated but not air conditioned and was <br />installed outdoors. <br />11) TITLE AND LOCATION (Cdv and State) <br />ETED <br />PROFESSIONAL SERVICES CONSTRUCTION (dappllcable) <br />Margate Lift Station No. 22 <br />Margate, FL <br />2014 2015 <br />(3) BRIEF DESCRIPTION /Brief scooe. size. cost. am.) AND SPECIFIC ROLE Check a oroiecl performed With wren finn <br />e. <br />BEC provided design of the electrical and control system for the duplex lift station improvements in accordance with the City <br />standards. Our design included solid state starters for the pump motors. <br />STANDARD FORM 330 (REV. 812016) PAGE 3 <br />78 <br />