Laserfiche WebLink
E. RESUMES OF KEV PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key <br />person.) <br />12. NAME 13, ROLEIN THIS CONTRACT 14, YEARS EXPERIENCE <br />a TOTAL b. WIiH CURRENT FDUA <br />Gregory J. Stelmack, P.E. Principal Geotechnical Engineer 28 6 <br />15. FIRM NAME AND LOCATION (Corp and State) <br />RADISE International, L.C., Riviera Beach, FL <br />16. EDUCATION (DEGREEANO SPECIA MITIOA9 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE) <br />B.S., Civil & Environmental Engineering, University of Wisconsin, <br />Professional Engineer, Florida No. 70556 <br />Madison <br />18. OTHERPROFESSIONAL QUALIFICATIONS (Poblimtiom. Otganhadom, Training, Avwa,, ex.) <br />Mr. Stelmack is skilled in providing construction materials testing and engineering inspection testing services including quality <br />assurance/quality control for a wide variety of commercial, transportation, water resources, industrial, retail and institutional <br />projects. He specializes in providing design recommendations for deep and shallow foundation systems for a variety of project <br />types. He has worked on major projects throughout Florida, and served as Project Manager and Senior Geotechnical Engineer on <br />numerous projects for private and public clients including FDOT USACE and SFWMD. <br />19. RELEVANT PROJECTS <br />(1) THTLE AND LOCATION (Cil and Smle) (2) YEAR COMPLETED <br />6420 Pump Station Design of Turning Vane & Pump PROFESSIONAL SERVICES CONSTRUCTION (fapp4 abk) <br />Modifications, Miami -Dade County, FL 1 2017 <br />(3) BRIEF DESCRIPTION (1141f.X. size, rnst. etc) AND SPECIFIC ROLE ® Check ifptaje t pelfained with cunem then <br />a, <br />Geotechnical Engineer. Geotechnical engineering services including field exploration/testing and laboratory testing services. <br />The field exploration program to evaluate the existing subsurface conditions for the project consisted of drilling three (3) <br />Standard Penetration Test borings to depths of 40 feet below the existing ground surface. Soil classifications were based on <br />visual observations supplemented by laboratory test results performed on selected representative samples. Laboratory index <br />tests consisting of full Sieve Analysis, Natural Moisture and Organics Content tests were performed on selected samples. <br />(1) TITLE AND LOCATION (Ciy aM State) <br />(2) YEAR COMPLETED <br />Everglades Agricultural Area A-1 Flow Equalization Basin <br />PROFESSIONALSERVICES <br />CONSTRUCTION (if opy&able) <br />Palm Beach County, FL <br />I Ongoing <br />I Ongoing <br />b, <br />(3) BRIEF DESCRIPTION (Bl1gl.X size, cost ae.) AND SPECIFIC ROLE ® Check if project peefomcd with current firm <br />Project Manager and Engineer of Record. Geotechnical design and EDC (engineering during construction) materials testing <br />as well as quality assurance and inspection. Tests include specific gravity, sieve analysis, proctor, organic content, moisture <br />content and Atterberg limits. The work involved laboratory testing for embankment construction. <br />(1) TITLE AND LOCATION (City and Slate) <br />(2) YEAR COMPLETED <br />Wastewater Lift Station Rehabilitation, <br />PROFESSIONAL SERVICES <br />CONSTRUCTION(faealirable) <br />Palm Beach County, FL <br />2013 <br />C. <br />(3) BRIEF DESCRIPTION (Brieftrop she, rust etc.) AND SPECIFIC ROLE ® Check if mi. ist formed with curlem fmn <br />Project Manager and Engineer of Record. Project consisted of providing geotechnical engineering including field and <br />laboratory testing services. <br />(1) TITLE AND LOCATION (Go, atW State) <br />(2) YEAR COWLETED <br />Eastpointe Pump Station, <br />PROFESSIONAL SERVICES <br />CONSTRUCTIONOfiPPh'rn6/e) <br />Palm Beach County, FL <br />2014 <br />d. <br />(3) BRIEF DESCRIPTION (Bnefrs X,, size, cost erc.l AND SPECIFIC ROLE ® Check ifpmjaa pvfomed with current fimn <br />Project Manager. Geotechnical engineering evaluation, Construction material testing and report preparation for renovations at <br />the Pump Station. The renovations included concrete king post pile panel retaining walls, concrete pad at the channel bottom <br />to support three new pumps and a precast concrete building. <br />(1) TITLE AND LOCATION 'City aM Stale) <br />(2) YEAR COMPLETED <br />HHD Culverts 5A/5, 4A/3,11/16 Replacement and Rehabilitation, <br />PROFESSIONALSERVICES <br />CONSTRUCTION(ifalselkable) <br />Palm Beach, Martin, Hendry Counties <br />Ongoing <br />Ongoing <br />(3) BRIEF DESCRIPTION Brief+cope, size cos 1, ele) AND SPECIFIC ROLE ®CM1eck ifpojat performed wdh amem fmm <br />Project Manager, Geotechnical Engineer of Record and Materials Engineer for construction inspection and lab and field <br />e• <br />materials testing services. The work included the demolition of existing Culverts and placement of new cast -in-place concrete <br />culvert structures with gates and control systems and restoring the embankment, demolition of existing Culverts, the <br />reconstruction of new structures and rehabilitation structure replacements. Also provided quality control services during <br />concrete placement and casting of the building components. Services included a substantial role in inspection and oversight of <br />earthwork tasks. <br />f ISE <br />STANDARD FORM 330 <br />