Laserfiche WebLink
L.RESUMES OF KEY PERSONNEL 1 FOR <br />(Complete Section E for key <br />one each perann.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />a TOTAL b WITH CURRENT FIRM <br />Tom Mullin P.E. Chief Geotechnical Engineer 40 5 <br />15. FIRM NAME AND LOCATION (Cir, and State) <br />RADISE International, LC, Riviera Beach, FL <br />16. EDUCATION(DEGREEANDSPECMLILITIONI <br />17. CURRENT PROFESSIONAL REGISTRATION(STAT£AND DISCIPLINE) <br />M.S., Geotechnical Engineering, University of Illinois <br />Professional Engineer, Florida No. 43366 <br />B.S. Civil Engineering, University of Illinois <br />18. OTHER PROFESSIONAL QUALIFICATIONS (PuMicafmu. Orgunimdom, Twining. Awards, ewJ <br />Mr. Mullin has managed projects involving transportation, major high-rise towers, commercial buildings, power generating and <br />industrial facilities, as well as landfill projects in Florida, Puerto Rico and the Caribbean. His skills include foundation design and <br />construction, backfilling, test programs, quality control testing procedures and documentation, installation and evaluation of <br />geotechnical monitoring instrumentation, vibration monitoring and pile load testing. He provides quality assurance oversight; CEI <br />documentation; construction surveillance inspection and testin • and technical peer review. <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and Score) <br />(2) YEAR COMPLETED <br />6420 Pump Station Design of Turning Vane & Pump <br />PROFESSIONALSERVICES CONSTRUCTION (fapy£cabfe) <br />Modifications, Miami -Dade County, FL <br />2017 <br />(3) BRIEF DESCRIPTION (Bnefsrope, sin, .4 em) AND SPECIFIC ROLE Check ifproject pufimrd with amem firm <br />a• <br />Project Manager. Geotechnical engineering services including field exploration/testing and laboratory testing services. The <br />field exploration program to evaluate the existing subsurface conditions for the project consisted of drilling three (3) Standard <br />Penetration Test borings to depths of 40 feet below the existing ground surface. Soil classifications were based on visual <br />observations supplemented by laboratory test results performed on selected representative samples. Laboratory index tests <br />consisting of full Sieve Analysis, Natural Moisture and Organics Content tests were performed on selected samples. <br />(1) TITLE AND LOCATION (City and Sum) <br />(2) YEAR COMPLETED <br />Everglades Agricultural Area A-1 Flow Equalization Basin <br />PROFESSIONAL SERVICES <br />CONSTRUCTION ofapplicable) <br />Palm Beach County, FL <br />Ongoing <br />I Ongoing <br />b, <br />(3) BRIEF DESCRIPTION (Bnej x, sae. cos; n,J AND SPECIFIC ROLE Check ifpmjat perforrnM with cunem firm <br />Chief Geotechnical Engineer. Geotechnical design and EDC (engineering during construction) materials testing as well as <br />quality assurance and inspection. Tests include specific gravity, sieve analysis, proctor, organic content, moisture content and <br />Atterberg limits. The work involved laboratory testing for embankment construction. <br />(1) TITLE AND LOCATION(Citi aW &wte) <br />(2)MR COMPLETED <br />East Central Regional Water Reclamation Facility (ECRWRF) <br />PROFESSIONAL SERVICES <br />CONSTRUCTION flfWicab/e) <br />Biosolids Improvement Project <br />2014 <br />d• <br />(3) BRIEF DESCRIPTION (Bri jsro n, sae, cost, emJ AND SPECIFIC ROLE ® Ch k HMjM xobw 6 with... Poco <br />Chief Geotechnical Engineer. Geotechnical engineering and field/laboratory testing services for the new construction of a <br />Dewatering Building and Odor Control Facility at the ECRWRF. The structures are part of an overall design package for the <br />un2rade of the ECRWRF Biosolids Project. <br />(1) TITLE AND LOCATION /Cir, and Stme) <br />(2) YEAR COMPLETED <br />Wastewater Lift Station Rehabilitation, <br />PROFESS(ONALSERVICES <br />CONSTRUCTION f ,,ffcabk) <br />Palm Beach County, FL <br />2013 <br />d. <br />(3) BRIEF DESCRIPTION (Bn'rfsrope, sag cos; etc) AND SPECIFIC ROLE ®Chale i[pmjeal pnfomd with nvmnt firm <br />Chief Geotechnical Engineer. Project consisted of providing geotechnical engineering including field and laboratory testing <br />services. <br />(1) TITLE AND LOCATION (City a Stam) <br />(2) YEAR COMPLETED <br />HHD Culverts 5A & 5 Replacement and Rehabilitation <br />PROFESSIONAL SERVICES <br />CONSTRUCTION Ff Wlcable) <br />Palm Beach, Martin, Hendry Counties <br />Ongoing <br />Ongoing <br />e <br />(3) BRIEF DESCRIPTION lBrieJsrope, sae, aos; ex. AND SPECIFIC ROLE ® Chak ifimjat I nTo with cunem Po,n <br />Chief Geotechnical Engineer. Construction inspection and materials testing services. The work included the demolition of <br />existing Culverts 11 and 16 and placement of new cast -in-place concrete culvert structures with gates and control systems and <br />restoring the embankment; demolition of existing Culverts 4A and 3 and the reconstruction of new structures; and <br />rehabilitation structure replacements for Culverts 5A and 5. Testing included soils structural concrete and asphalt. <br />RADISE <br />STANDARD FORM 330 <br />