|
L.RESUMES OF KEY PERSONNEL 1 FOR
<br />(Complete Section E for key
<br />one each perann.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />a TOTAL b WITH CURRENT FIRM
<br />Tom Mullin P.E. Chief Geotechnical Engineer 40 5
<br />15. FIRM NAME AND LOCATION (Cir, and State)
<br />RADISE International, LC, Riviera Beach, FL
<br />16. EDUCATION(DEGREEANDSPECMLILITIONI
<br />17. CURRENT PROFESSIONAL REGISTRATION(STAT£AND DISCIPLINE)
<br />M.S., Geotechnical Engineering, University of Illinois
<br />Professional Engineer, Florida No. 43366
<br />B.S. Civil Engineering, University of Illinois
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (PuMicafmu. Orgunimdom, Twining. Awards, ewJ
<br />Mr. Mullin has managed projects involving transportation, major high-rise towers, commercial buildings, power generating and
<br />industrial facilities, as well as landfill projects in Florida, Puerto Rico and the Caribbean. His skills include foundation design and
<br />construction, backfilling, test programs, quality control testing procedures and documentation, installation and evaluation of
<br />geotechnical monitoring instrumentation, vibration monitoring and pile load testing. He provides quality assurance oversight; CEI
<br />documentation; construction surveillance inspection and testin • and technical peer review.
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and Score)
<br />(2) YEAR COMPLETED
<br />6420 Pump Station Design of Turning Vane & Pump
<br />PROFESSIONALSERVICES CONSTRUCTION (fapy£cabfe)
<br />Modifications, Miami -Dade County, FL
<br />2017
<br />(3) BRIEF DESCRIPTION (Bnefsrope, sin, .4 em) AND SPECIFIC ROLE Check ifproject pufimrd with amem firm
<br />a•
<br />Project Manager. Geotechnical engineering services including field exploration/testing and laboratory testing services. The
<br />field exploration program to evaluate the existing subsurface conditions for the project consisted of drilling three (3) Standard
<br />Penetration Test borings to depths of 40 feet below the existing ground surface. Soil classifications were based on visual
<br />observations supplemented by laboratory test results performed on selected representative samples. Laboratory index tests
<br />consisting of full Sieve Analysis, Natural Moisture and Organics Content tests were performed on selected samples.
<br />(1) TITLE AND LOCATION (City and Sum)
<br />(2) YEAR COMPLETED
<br />Everglades Agricultural Area A-1 Flow Equalization Basin
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION ofapplicable)
<br />Palm Beach County, FL
<br />Ongoing
<br />I Ongoing
<br />b,
<br />(3) BRIEF DESCRIPTION (Bnej x, sae. cos; n,J AND SPECIFIC ROLE Check ifpmjat perforrnM with cunem firm
<br />Chief Geotechnical Engineer. Geotechnical design and EDC (engineering during construction) materials testing as well as
<br />quality assurance and inspection. Tests include specific gravity, sieve analysis, proctor, organic content, moisture content and
<br />Atterberg limits. The work involved laboratory testing for embankment construction.
<br />(1) TITLE AND LOCATION(Citi aW &wte)
<br />(2)MR COMPLETED
<br />East Central Regional Water Reclamation Facility (ECRWRF)
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION flfWicab/e)
<br />Biosolids Improvement Project
<br />2014
<br />d•
<br />(3) BRIEF DESCRIPTION (Bri jsro n, sae, cost, emJ AND SPECIFIC ROLE ® Ch k HMjM xobw 6 with... Poco
<br />Chief Geotechnical Engineer. Geotechnical engineering and field/laboratory testing services for the new construction of a
<br />Dewatering Building and Odor Control Facility at the ECRWRF. The structures are part of an overall design package for the
<br />un2rade of the ECRWRF Biosolids Project.
<br />(1) TITLE AND LOCATION /Cir, and Stme)
<br />(2) YEAR COMPLETED
<br />Wastewater Lift Station Rehabilitation,
<br />PROFESS(ONALSERVICES
<br />CONSTRUCTION f ,,ffcabk)
<br />Palm Beach County, FL
<br />2013
<br />d.
<br />(3) BRIEF DESCRIPTION (Bn'rfsrope, sag cos; etc) AND SPECIFIC ROLE ®Chale i[pmjeal pnfomd with nvmnt firm
<br />Chief Geotechnical Engineer. Project consisted of providing geotechnical engineering including field and laboratory testing
<br />services.
<br />(1) TITLE AND LOCATION (City a Stam)
<br />(2) YEAR COMPLETED
<br />HHD Culverts 5A & 5 Replacement and Rehabilitation
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION Ff Wlcable)
<br />Palm Beach, Martin, Hendry Counties
<br />Ongoing
<br />Ongoing
<br />e
<br />(3) BRIEF DESCRIPTION lBrieJsrope, sae, aos; ex. AND SPECIFIC ROLE ® Chak ifimjat I nTo with cunem Po,n
<br />Chief Geotechnical Engineer. Construction inspection and materials testing services. The work included the demolition of
<br />existing Culverts 11 and 16 and placement of new cast -in-place concrete culvert structures with gates and control systems and
<br />restoring the embankment; demolition of existing Culverts 4A and 3 and the reconstruction of new structures; and
<br />rehabilitation structure replacements for Culverts 5A and 5. Testing included soils structural concrete and asphalt.
<br />RADISE
<br />STANDARD FORM 330
<br />
|