Laserfiche WebLink
<br /> <br /> <br />GATEWAY PARK CENTER <br />19-01-01 <br />TGSV Enterprises, Inc. <br /> <br />Page 3 <br /> <br /> <br />needs service, what the model number is, what parts / materials are required, and <br />who the service representative is, if required. This will also allow us to assist the <br />Owner in analyzing the life cycle costs of the project and help in determining what <br />products to use for the project, not only from an upfront cost analysis, but from an <br />overall facilities cost. <br /> <br />3. Products and Procedures Review: Our team’s construction management experience <br />has exposed us to almost every different material and construction technique available to <br />our industry. This experience has provided us firsthand knowledge of what materials work <br />best in given situations; which products can be substituted to provide cost effective <br />alternatives to a project; which construction techniques are most cost effective, time <br />effective and logistically suited for a project; and which products will provide the best life <br />and minimal maintenance based on the environment, usage and exposure of the project. <br /> <br />Our team, through its LEED AP BD+C accredited staff, will also provide a Life Cycle <br />Analysis and Energy Efficiency analysis on all the Roofing, Thermal Insulation, Exterior <br />Finishes, Mechanical Systems, Plumbing/Irrigation Systems, and Electrical/Lighting <br />Systems. This process can also be used to achieve a LEED Certification, if desired, for the <br />project. <br /> <br />The following are just some examples of Value Engineering techniques that we will <br />provide for this project. This is not an all-inclusive list: <br /> <br />a) Material Review: Our team will review the materials required for the project prior to the <br />creation of the material specifications. Once the major functioning materials are <br />identified by the Team, a list will be created listing each item by CSI category. The list <br />will have columns identifying what products are available for each material. Each <br />product will then be issued a value based on a point system that analyzes life cycle, <br />cost, availability, maintenance and warranty. The product with the highest rating will <br />then be submitted to the Team for approval. The list will also have a final column for <br />alternate materials should something be available that can substitute what was <br />originally intended for that area. Any alternate materials will be scored accordingly. <br /> <br />b) Construction Techniques: At the commencement of our pre-construction services we <br />will meet with the Team and agree on goals for budget and time for the project. Based <br />on these, our team will evaluate what elements and construction techniques best suit <br />the projects criteria. We will also analyze the logistics of the project site and consider <br />how the construction techniques being considered will influence the phasing / staging of <br />the project. Once we have agreed to what our options are for each area, we will again <br />score each option based on feasibility, life cycle, cost, availability, maintenance and <br />warranty. The scores will be analyzed and the technique receiving the highest score will <br />be submitted for approval. <br /> <br />