My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Approach - Methodology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
TGSV Enterprises
>
Tab 4 Approach
>
Approach
>
Approach - Methodology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 3:35:13 PM
Creation date
3/13/2019 3:35:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />GATEWAY PARK CENTER <br />19-01-01 <br />TGSV Enterprises, Inc. <br /> <br />Page 4 <br /> <br /> <br />c) Life Cycle Analysis / Energy Efficiency: In the same manner that we analyzed the <br />materials used in item a. of this section, the Team will analyze the equipment required <br />for the project. We will also, through our LEED AP staff, provide a detailed Efficiency <br /> <br />and Sustainability analysis based on the standards created by both the United States <br />Green Building Council and the Green Building Certification Institute. <br /> <br />d) Budget Analysis: Our team has developed a reliable cost management system based <br />on experienced analysis of local markets and experience with previous projects geared <br />to the delivery of projects within budget. The effectiveness and success of our cost <br />management system is attributed to the following factors: <br />• Understanding of Entire Construction Process <br />• Knowledge of Local Market <br />• Cost Data from Similar Projects <br />• Cost Data Verification with Manufacturers, Local Contractors and Local Suppliers <br />• Project Scope and Budget Validation at each phase of design <br />Our local market familiarity, experience, and cost management system provides <br />clients reliable construction budgets and effective cost control. <br /> <br />PHASING AND SCHEDULE <br /> <br />As stated above, TGSV incorporates scheduling/phasing as part of our cost review; as time is <br />money for everyone. We ensure that our trades are involved in this process so they have a <br />sense of accountability and ownership in the schedule. The same goes for the Owner/end user. <br />Understanding their needs and what they envision the impact to their facility will be during <br />construction is key to minimizing interruptions to the construction process; and also ensures that <br />the proper phasing/logistics are included in the project schedule and cost. Below please find the <br />different Scheduling Forms that will be utilized by our Team throughout the course of our services <br />for both internal and external communication. The reports are as follows: <br /> <br />1. Primavera Project Planner Critical Path Construction Schedule: This report <br />monitors the progress of each detailed procurement and construction activity. It <br />provides the scheduled start date, finish date, duration, float, phase and area of each <br />activity; plus it provides the list of activities which are on the “critical path” of the project. <br />As the report is updated with the actual progress of the project, it advises which <br />activities are ahead of schedule, on schedule or behind schedule, and automatically <br />updates which activities are on the “critical path” of the project. The generation of the <br />schedule is based on two keys items. First we will create a baseline schedule that is <br />derived from our 20 years of construction experience and archived schedules. Second, <br />this baseline schedule is issued to all trade contractors at a pre-construction meeting
The URL can be used to link to this page
Your browser does not support the video tag.