My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Maser Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Maser Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:05:37 AM
Creation date
8/21/2020 10:04:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ NO. 20-07-01 – CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br />SURVEYING AND MAPPING SERVICES / GEOTECHNICAL SERVICES <br />Maser Consulting <br />•Site Characterization <br />o Subsurface exploration <br />o Forensic Site Geotechnical Evaluations (including significant coastal experience) <br />o Geophysical surveys <br />o Geologic hazard evaluation <br />o Field & Laboratory testing <br />o Groundwater observations and hydrogeologic <br />modeling <br />•Design <br />o Pavement design <br />o Roadway cross sections <br />o Bridge foundations <br />o Earth retaining structures <br />o Slope/Rock slope stabilization <br />o Excavation support systems <br />•Construction <br />o Ground improvement <br />o Soil stabilization <br />o Materials testing <br />o Special inspections <br />o Instrumentation and monitoring <br />Maser Consulting provides geotechnical engineering services in accordance with the standard of care in <br />our industry. Our laboratory is accredited with the appropriate AASHTO and ASTM certifications. In <br />addition, any field staff that will be assigned to perform tests will be properly certified by the appropriate <br />agencies for any tests performed. A strict QA/QC process involving senior review is incorporated with <br />all deliverables, as is detailed in our QA/QC section above. <br />METHOD OF APPROACH <br />The successful execution of this contract will be achieved by ensuring each Work Order is organized, <br />managed and executed to meet the City’s requirements and delivery schedules. This will be <br />accomplished through initial coordination with the City’s Project Manager(s) assigned to each work <br />classification and followed by preliminary review and research, field reviews, scope clarification, effective <br />project management and development of a project specific safety and QA/QC plans. <br />Immediately upon receipt of any Work Order, our assigned Task Project Manager(s) will thoroughly <br />review the scope of services and meet with the City’s Project Manager and applicable staff to ensure a <br />clear and concise understanding of the project expectations, goals, objectives and schedule. If necessary, <br />an on-site review will be carried out to thoroughly assess the project characteristics, determine safety <br />and maintenance of traffic issues and note any special coordination, access issues or potential permits <br />required. This knowledge is then utilized to develop the project approach and determine the resources <br />needed for tasks included in the scope of services. Staff hour estimates will then be prepared along with <br />Section D, Page 6
The URL can be used to link to this page
Your browser does not support the video tag.