Laserfiche WebLink
E-64Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />CES provided Construction Management services for Miami-Dade County’s $600M High-Level <br />Disinfection (HLD) Water Reclamation Treatment Plant at the South District Wastewater Treatment <br />Plant (SDWWTP). CES also provided Construction Inspection and Construction Administration <br />services on this regulatory driven wastewater collection and transmission system project and <br />was responsible for overseeing the installation of: 1,500 LF of 120” Reinforced Concrete Pipe for <br />treated wastewater; 3,000 LF of 96” Reinforced Concrete Pipe for treated wastewater; 5,000 <br />LF of 36” Ductile Iron Pipe for treated wastewater; and 2,000 LF of 24” Ductile Iron Pipe for <br />treated wastewater. CES staff were key contributing members overseeing and managing the <br />construction effort for the completion of all 14 separate projects that composed the HLD project. <br />Considered a precursor to the Water Reclamation Project, Miami-Dade County’s HLD Plant <br />produces highly treated wastewater that subsequently goes through the water reclamation <br />process of microfiltration, reverse osmosis, hydrogen peroxide addition, and ultraviolet <br />disinfection. As part of MDWASD’s Wastewater Master Plan, this project allows the County <br />to reduce the amount of water to be treated as potable water by about 60 million gallons <br />daily (MGD). Increasing the peak flow capacity of the SDWWTP by 27%, from 225 MGD to 285 <br />MGD, also allows more wastewater to be pumped to the plant during rain events, recharges the <br />Biscayne aquifer, and reduces the energy consumption required for treatment. <br />All treated wastewater coming from the existing secondary treatment plant is filtered and <br />disinfected to ensure Miami-Dade County complies with all Florida Department of Environmental <br />Protection (FDEP) requirements. The completed project allows Miami-Dade County to meet <br />specific FDEP and U.S. Environmental Protection Agency requirements for the high-level <br />disinfection of wastewater prior to its disposal into deep injection wells. <br />Cost <br />$600M <br />Completed within <br />Budget & schedule <br />Yes <br />Key Features <br />General Construction <br />Management/Administration <br />Construction Engineering & <br />Inspections <br />Civil & Utilities <br />High-Level Disinfection (HLD) <br />Water Reclamation Treatment <br />Plant <br />Wastewater Treatment Plant <br />Piping <br />Phased Construction <br />Interagency Coordination <br />Program Controls: Scheduling <br />& Cost Estimating <br />F. Example projects which best illustrate proposed team’s qualifications for this contract <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />12 <br />21. TITLE AND LOCATION (City and State) <br />MDWASD South District Wastewater Treatment Plant High-Level <br />Disinfection Upgrades, Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014 2014 <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />MDWASD/ AECOM (PM)Roger F. Williams, PE 305.718.4828 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />25. Firms from section involved with this project <br />A. <br />(1) FIRM NAME (2) FIRM LOCATION (City & State) (3) ROLE <br />CES Consultants, Inc.Miami & Pembroke Pines, FL General Construction Management/ <br />Administration, Construction Engineering & <br />Inspections, Civil & Utilities <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3