Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> 20. EXAMPLE PROJECT KEY <br /> NUMBER <br />18 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />Plantation Isles Neighborhood Drainage Improvements, <br />Plantation, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 - 2019 2020 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> <br />a. PROJECT OWNER <br />b. POINT OF CONTACT NAME <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Plantation Mr. Brett Butler, P.E. C.F.M. <br />Director of Engineering <br />Phone: (954) 797-2282 <br />Email: bbutler@plantation.org <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Craven Thompson provided surveying, analysis, assessment for <br />repair/replacement of existing storm water management systems, <br />preparation of construction documents and permitting, bidding <br />assistance, and construction services for the Plantation Isles <br />Neighborhood. The neighborhood is 448 acres in size and is <br />bounded the Peters Road to the north, the Florida Turnpike to the <br />east, Royal Palm Estates to the west, and I-595 to the south. <br />Improvements included: <br />▪ 3,150 LF of swale re-grading, <br />▪ 5,359 LF of storm sewer removal, <br />▪ removal of 161 storm drainage structures, <br />▪ the installation of 2,217 LF of 15” diameter storm sewer, <br />▪ 471 LF of 18” diameter storm sewer, <br />▪ 429 LF of 24” diameter storm sewer, <br />▪ 576 LF of 30” diameter storm sewer, <br />▪ 828 LF of 36” diameter storm sewer, <br />▪ 321 LF of 42” diameter storm sewer, <br />▪ 101 LF of 48” diameter storm sewer, <br />▪ 116 LF of 72” diameter storm sewer. <br />▪ removal and replacement of 5 outfalls, <br />▪ installation of 160 – 30” diameter ADS drainage structures. <br />The project also included C.I.P.P. lining of: <br />▪ 1,213 LF of 12” diameter storm sewer, <br />▪ 3,488 LF of 15” diameter storm sewer, <br />▪ 1,839 LF of 18” diameter storm sewer, <br />▪ 487 LF of 21” diameter storm sewer, <br />▪ 1,540 LF of 24” diameter storm sewer, <br />▪ 244 LF of 30” diameter storm sewer, <br />▪ 482 LF of 42” diameter storm sewer. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Craven Thompson & <br />Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br />3563 NW 53rd Street <br />Fort Lauderdale, Florida 33309 <br />(3) Role <br />Prime – Surveying, Stormwater Asset <br />Assessment, Stormwater Modeling, Design, <br />Construction Plans, Bid Assistance, Permitting, <br />and CEI Services <br />b. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />c. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />▪ pipe bursting consisting of: <br />◦ 93 LF of 12” diameter pipe with 15” pipe, <br />◦ 56 LF of 15” diameter pipe with 18” pipe, <br />◦ 166 LF of 21” diameter pipe with 24” pipe. <br />▪ Restoration of the disturbed right-of-way areas was also <br />included. <br />E | Page 110