<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
<br />QUALIFICATIONS FOR THIS CONTRACT
<br />(Present as many projects as requested by the agency, or 10 projects, if not specified.
<br />Complete one Section F for each project.)
<br /> 20. EXAMPLE PROJECT KEY
<br /> NUMBER
<br />18
<br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED
<br />Plantation Isles Neighborhood Drainage Improvements,
<br />Plantation, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2017 - 2019 2020
<br />
<br />23. PROJECT OWNER'S INFORMATION
<br />
<br />
<br />a. PROJECT OWNER
<br />b. POINT OF CONTACT NAME
<br />c. POINT OF CONTACT TELEPHONE NUMBER
<br />City of Plantation Mr. Brett Butler, P.E. C.F.M.
<br />Director of Engineering
<br />Phone: (954) 797-2282
<br />Email: bbutler@plantation.org
<br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
<br />Craven Thompson provided surveying, analysis, assessment for
<br />repair/replacement of existing storm water management systems,
<br />preparation of construction documents and permitting, bidding
<br />assistance, and construction services for the Plantation Isles
<br />Neighborhood. The neighborhood is 448 acres in size and is
<br />bounded the Peters Road to the north, the Florida Turnpike to the
<br />east, Royal Palm Estates to the west, and I-595 to the south.
<br />Improvements included:
<br />▪ 3,150 LF of swale re-grading,
<br />▪ 5,359 LF of storm sewer removal,
<br />▪ removal of 161 storm drainage structures,
<br />▪ the installation of 2,217 LF of 15” diameter storm sewer,
<br />▪ 471 LF of 18” diameter storm sewer,
<br />▪ 429 LF of 24” diameter storm sewer,
<br />▪ 576 LF of 30” diameter storm sewer,
<br />▪ 828 LF of 36” diameter storm sewer,
<br />▪ 321 LF of 42” diameter storm sewer,
<br />▪ 101 LF of 48” diameter storm sewer,
<br />▪ 116 LF of 72” diameter storm sewer.
<br />▪ removal and replacement of 5 outfalls,
<br />▪ installation of 160 – 30” diameter ADS drainage structures.
<br />The project also included C.I.P.P. lining of:
<br />▪ 1,213 LF of 12” diameter storm sewer,
<br />▪ 3,488 LF of 15” diameter storm sewer,
<br />▪ 1,839 LF of 18” diameter storm sewer,
<br />▪ 487 LF of 21” diameter storm sewer,
<br />▪ 1,540 LF of 24” diameter storm sewer,
<br />▪ 244 LF of 30” diameter storm sewer,
<br />▪ 482 LF of 42” diameter storm sewer.
<br />
<br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
<br />
<br />a.
<br />(1) FIRM NAME
<br />Craven Thompson &
<br />Associates, Inc.
<br />(2) FIRM LOCATION (City and State)
<br />3563 NW 53rd Street
<br />Fort Lauderdale, Florida 33309
<br />(3) Role
<br />Prime – Surveying, Stormwater Asset
<br />Assessment, Stormwater Modeling, Design,
<br />Construction Plans, Bid Assistance, Permitting,
<br />and CEI Services
<br />b.
<br />(1) FIRM NAME
<br />
<br />
<br />
<br />(2) FIRM LOCATION (City and State)
<br />
<br />(3) Role
<br />
<br />c.
<br />(1) FIRM NAME
<br />
<br />
<br />
<br />(2) FIRM LOCATION (City and State)
<br />
<br />(3) Role
<br />
<br />▪ pipe bursting consisting of:
<br />◦ 93 LF of 12” diameter pipe with 15” pipe,
<br />◦ 56 LF of 15” diameter pipe with 18” pipe,
<br />◦ 166 LF of 21” diameter pipe with 24” pipe.
<br />▪ Restoration of the disturbed right-of-way areas was also
<br />included.