My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />Original Section Drainage Improvements, Phase 3 <br />Greenacres, Florida <br /> <br />West Palm Beach, Florida <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Work: <br /> <br />The Original Section Drainage Improvements project located <br />in the City of Greenacres is a master planned drainage <br />improvement project for an existing 250-acre neighborhood <br />between Jackson Avenue and Fleming Avenue, from Lake <br />Worth Road to 10th Avenue North. This project was also <br />known as First Street Phase 3 and included grading and <br />drainage along the east portion of First Street. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CLIENT CONTACT: <br />Ms. Kara Irwin Ferris, AICP <br />Director of Planning and Engineering <br />City of Greenacres <br />5800 Melaleuca Lane <br />Greenacres, Florida 33463 <br />Phone: (561) 642-2054 <br />Fax: (561) 642-2049 <br />Email: kferris@greenacresfl.gov <br /> CTA PERSONNEL ON PROJECT: <br />Patrick Gibney, P.E. <br />Douglas Taylor, P.E. <br />Richard Pryce, P.S.M. <br />Nicholas Messina, Jr., P.S.M. <br />Don Shaver <br />James Sheddy <br />PROJECT DURATION: <br />2017 - 2018 <br />CRAVEN THOMPSON’S FEES <br />$26,700.00 <br />CONSTRUCTION COST <br />$327,765.00 <br />F | Page 10
The URL can be used to link to this page
Your browser does not support the video tag.