Laserfiche WebLink
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />Original Section Drainage Improvements, Phase 3 <br />Greenacres, Florida <br /> <br />West Palm Beach, Florida <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Work: <br /> <br />The Original Section Drainage Improvements project located <br />in the City of Greenacres is a master planned drainage <br />improvement project for an existing 250-acre neighborhood <br />between Jackson Avenue and Fleming Avenue, from Lake <br />Worth Road to 10th Avenue North. This project was also <br />known as First Street Phase 3 and included grading and <br />drainage along the east portion of First Street. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CLIENT CONTACT: <br />Ms. Kara Irwin Ferris, AICP <br />Director of Planning and Engineering <br />City of Greenacres <br />5800 Melaleuca Lane <br />Greenacres, Florida 33463 <br />Phone: (561) 642-2054 <br />Fax: (561) 642-2049 <br />Email: kferris@greenacresfl.gov <br /> CTA PERSONNEL ON PROJECT: <br />Patrick Gibney, P.E. <br />Douglas Taylor, P.E. <br />Richard Pryce, P.S.M. <br />Nicholas Messina, Jr., P.S.M. <br />Don Shaver <br />James Sheddy <br />PROJECT DURATION: <br />2017 - 2018 <br />CRAVEN THOMPSON’S FEES <br />$26,700.00 <br />CONSTRUCTION COST <br />$327,765.00 <br />F | Page 10