My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />Luis Pimentel, P.E. (continued) <br />Biscayne Lake Gardens Milling and Resurfacing | Aventura, Florida | Civil Engineer <br />Craven Thompson provided surveying and civil engineering for the development at the SW corner of NE <br />203rd Street and NE 29th Place. Mr. Pimentel assisted in the design and permitting of the Milling and <br />Resurfacing of the public roads within the Biscayne Lake Gardens development. Processed permit <br />applications with Miami-Dade County Department of Transportation and Public Works. Prepared bid <br />documents and assisted with RFI responses during construction. <br />NE 29th Place South (Drainage) | Aventura, Florida | Civil Engineer <br />Craven Thompson provided surveying and civil engineering for NE 29th Place between Aventura Boulevard <br />and Abigail Road. Mr. Pimentel assisted in the design and permitting of stormwater improvements for NE <br />29th Place between Aventura Boulevard and Abigail Road. Worked on design plans and stormwater <br />calculations. Processed permit applications with Miami Dade Department of Environmental Resources <br />Management and Miami-Dade County Department of Transportation and Public Works. Prepared bid <br />documents and assisted with RFI responses during construction. <br />NE 203rd Street Sidewalk | Aventura, Florida | Civil Engineer - Craven Thompson provided surveying and <br />civil engineering for the southwest corner of NE 203rd Street and NE 29th Place. Mr. Pimentel assisted in <br />the design and permitting for the installation of a concrete sidewalk at the southwest corner of NE 203rd <br />Street and NE 29th Place. Worked on design plans and coordinated with Traffic Engineering sub <br />consultant for traffic related improvements. Processed permit applications with Miami-Dade County <br />Department of Transportation and Public Works. Prepared bid documents and assisted with RFI <br />responses during construction. <br />NE 213th Street Milling and Resurfacing | Aventura, Florida | Civil Engineer - Craven Thompson provided <br />surveying and civil engineering for NE 213th St. from Biscayne Boulevard to NE 34th Avenue. Mr. Pimentel <br />assisted in the design and permitting of the Milling and Resurfacing of NE 213th St. between Biscayne <br />Blvd. and NE 34th Ave. Processed permit applications with Miami-Dade County Department of <br />Transportation and Public Works. Prepared bid documents and assisted with RFI responses during <br />construction. <br />NE 191st Street Drainage Improvements | Aventura, Florida | Civil Engineer - Craven Thompson provided <br />surveying and civil engineering for NE 191st St. from Biscayne Blvd. to NE 29th Ave. Mr. Pimentel assisted <br />in the design and permitting of stormwater improvements for NE 191st St. between Biscayne Blvd. and <br />NE 29th Ave. Worked on design plans and stormwater calculations. Processed permit applications with <br />Miami Dade Department of Environmental Resources Management and Miami-Dade County Department <br />of Transportation and Public Works. Prepared bid documents and assisted with RFI responses. <br />NE 207tth Street Milling & Resurfacing Project | Aventura, Florida | Civil Engineer - The project included <br />the milling and resurfacing of NE 207th Street from Biscayne Boulevard up to the One Island Place <br />gatehouse, The Work also included curb & gutter repair, pavement marking & signage, and <br />manhole/valve box adjustments. <br />Country Club Drive Milling & Resurfacing Project | Aventura, Florida | Civil Engineer - The project included <br />the complete milling and resurfacing of the outside half of right-of-way of Country Club Drive, including <br />milling, asphalt paving, curbing, sidewalk repairs, re-setting brick pavers, handicap ramps, adjusting <br />utilities, pavement markings, grading and restoration. <br />Miami Gardens Livable Neighborhoods Vista Verde Phases 1C, 1D, 2, & 3 | Miami Gardens, Florida | <br />Civil Engineer. Assisted in the design and permitting of stormwater improvements for multiple areas <br />within the Vista Verde neighborhood in the City of Miami Gardens. Improvements included: 7,280 linear <br />feet of storm sewer, 5,640 linear feet of exfiltration trench, 140 drainage structures, 30,050 SY of <br />roadway milling & resurfacing, and 29,900 SY of roadway reconstruction. <br />F | Page 45
The URL can be used to link to this page
Your browser does not support the video tag.