My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Systems International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Coastal Systems International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:42:55 AM
Creation date
8/21/2020 10:42:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />August 18, 2020 <br />Professional Consulting Services <br />City of Sunny Isles Beach <br />RFQ No. 20-07-01 <br /> Page 16 <br /> <br />and concerns regarding the project. Summary meeting minutes will be compiled after each <br />meeting and posted on the City’s website, as appropriate. <br /> <br />Project Management PlanProject Management PlanProject Management PlanProject Management Plan <br /> <br />Our team approaches every project individually to develop a design that will complement <br />on-site conditions, meet the City’s program, be compatible with adjacent uses, and is <br />consistent with local culture. For each project, we will carefully analyze the existing <br />conditions, including but not limited to, environmental resources, geotechnical conditions, <br />vegetation, topography, cultural resources, historic resources, circulation, access, adjacent <br />uses, existing utilities, maintenance resources and stakeholder resources. This process <br />allows for consideration of existing features concurrent with the development of potential <br />new improvements. <br /> <br />The preliminary design options will be evaluated through community outreach workshops <br />and stakeholder meetings to arrive at a preferred design. Engineering plans and outreach <br />documents will be prepared to include “Opportunities and Constraints” presentation <br />boards, precedent images to help convey the design concept, and illustrations of the <br />preferred plan. Our team will also prepare recommendations for future maintenance <br />programs, including projected costs. <br /> <br />Our Design Process is summarized as follows: <br /> <br />Phase I – Study and Report <br /> <br />1. Pre-Design Services: <br />a. Project kick-off meeting <br />b. Site reconnaissance meetings <br />c. Survey and historical site information review <br />d. Geotechnical report preparation to understand subsoil characteristics, such as <br />percolation and drainage capacity, and soil bearing capacity. <br />e. Infrastructure inventory analysis to understand existing conditions, opportunities <br />and constraints. <br /> <br />2. Vision Session and Meetings with City Staff, Commission, Committees, and/or <br />Boards, as required to understand the goals and objectives for the project <br /> <br />Phase II – Preliminary Design <br /> <br />1. Conceptual Design (30% Plans):
The URL can be used to link to this page
Your browser does not support the video tag.