My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Systems International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Coastal Systems International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:42:55 AM
Creation date
8/21/2020 10:42:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />August 18, 2020 <br />Professional Consulting Services <br />City of Sunny Isles Beach <br />RFQ No. 20-07-01 <br /> Page 17 <br /> <br />a. Project illustrations to include infrastructure plans, perspective sketches, <br />sections, schedules of materials, plantings, and other elements necessary to <br />convey proposed ideas for concept plans. <br /> <br />b. Preliminary Budgets for concept plans. <br /> <br />2. Visioning Sessions with Staff, Mayor and Commission, Boards and Committees <br /> <br />3. Workshop Public/Community Meeting <br /> <br />4. Selected Conceptual Design submission to the City <br /> <br />Phase III – Final Design and Construction Documents <br /> <br />1. Construction Document preparation once the conceptual design is approved by the <br />City. <br /> <br />2. Phased plan production for design development. Design documents will be provided <br />at 60%, 90%, and 100% completion to coordinate the effort with local, State, and <br />Federal regulatory agencies having jurisdiction over the project. These agencies may <br />include the following: <br /> <br />• City of Sunny Isles Beach – Public Works <br />• City of Sunny Isles Beach – Planning Department <br />• City of Sunny Isles Beach – Building Department <br />• City of Sunny Isles Beach – Fire Department <br />• City of Sunny Isles Beach – Engineering Department <br />• Miami-Dade County Department of Environmental Resource Management <br />• Florida Department of Transportation (FDOT) <br />• Florida Department of Environmental Protection <br />• Florida Fish and Wildlife Service (FWS) and Conservation Commission (FWC) <br />• U.S. Army Corps of Engineers <br />• NOAA National Marine Fisheries Service <br /> <br />3. Environmental permitting to obtain all final permits for project construction. <br /> <br />4. Provide copies (electronic and hardcopies) as required by the City’s representative. <br /> <br />5. Presentations to City Commission & Stakeholders regarding project progress and <br />final designs, if necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.