My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Universal Engineering Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Universal Engineering Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:06:57 AM
Creation date
8/21/2020 11:06:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Engineering Sciences | 18 <br />E. Qualification Information and Assigned Personnel <br />12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />N/A2016 <br />2016 <br />2015 <br />2015 <br />Ongoing <br />N/A <br />N/A <br />N/A <br />N/A <br />• <br />• <br />• <br />• <br />• <br />Peter G. Read, PE Senior Geotechnical Engineer 36 20 <br />Universal Engineering Sciences, LLC (West Palm Beach, FL) <br />BS, Civil Engineering <br />American Society of Civil Engineers <br />Professional Engineer - FL <br />State of Florida General Contractor CGC #47304 <br />DB13-WASD-04 Shenandoah Area (Miami, FL) <br />Indian Creek Drive ROW Infrastructure Improvements (Miami Beach, FL) <br />This project included furnishing and installing 8-inch ductile iron water mains within the project boundary and fi re hydrant assem- <br />blies, long- and short-service connections within the public right of way, relocating existing water meter from the rear of private <br />properties to the right of way, and installing water service lines within private property for those properties with water meter <br />relocations. Peter served was the Principle in Charge. <br />The project included roadway, drainage, lighting, and signalization improvements as well as replacement of a bulkhead wall <br />along the existing canal. Additionally, the geotechnical services included providing design services for a pump station at 32nd <br />Street, which included developing engineering recommendations for pump station foundation and excavation support. Peter <br />served as Principle in Charge. <br />Miami Beach Convention Center Renovation (Miami Beach, FL) <br />This project consists of the renovation and expansion of the existing Miami Beach Convention Center with the addition of a <br />two-story ballroom and meeting space with parking located on the roof of the north and west addition. Additionally, the project <br />includes the construction of a park pavilion west of Convention Center Drive. Pater serves as the Principle in Charge. <br />The project consisted of constructing a 108,350 square feet enclosed dry storage facility that will replace an existing dry stack <br />marina containing 260 open-rack dry storage units. The project also included a pile-supported slab-on-grade for forklifts. Addi- <br />tionally, fl oating docks will be constructed in Biscayne Bay. The project also included sheet pilling to bring the site to grade. Peter <br />served as a Principle in Charge. <br />Westrec Haulover Marine Center (Miami Beach, FL) <br />DB14-WASD-05 48-Inch Water Main (Miami, FL) <br />The project included providing geotechnical services during preparation of the design-build criteria package for the pipe instal- <br />lation, which required fi ve mirco-tunneling crossings and the rest with open-cut installation. Peter provided project oversight and <br />fi nal review of GBR and GDR reports that were integral parts of the contract documents.
The URL can be used to link to this page
Your browser does not support the video tag.